PCN 504819-000

Effective Date:  June 29, 2010

PII 54863
Revision AD

1

HVSA-3-1580S 

15kV Class

Transition Splice for 3/C PILC to 
3/C Armored Extruded Dielectric (Poly/EPR) Power Cables

Suggested Installation Equipment (not supplied with kit)

•  Cable preparation tools
•  Tyco Electronics P63 cable preparation kit or cable manufacturer 

approved solvent

•  Clean, lint-free cloths
•  Non-conducting abrasive cloth, 120 grit or finer
• Electrician’s 

tape

•  Connector(s) and installation tools
•  Tyco Electronics recommended torch

Safety Instructions

DANGER:

  When installing electrical power system accessories, 

failure to follow applicable personal safety requirements and written 
installation instructions could result in fire or explosion and serious 
or fatal injuries.

To avoid risk of accidental fire or explosion when using gas torches, 
always check all connections for leaks before igniting the torch and 
follow the torch manufacturer’s safety instructions.

To minimize any effect of fumes produced during installation, always 
provide good ventilation of confined work spaces.

As Tyco Electronics has no control over field conditions which 
influence product installation, it is understood that the user must 
take this into account and apply his own experience and expertise 
when installing product.

Customer Service

For 24 hour customer service, call 800-327-6996.

Recommended Tyco Electronics Torches

Install heat-shrinkable cable accessories with a “clean burning” torch, 
i.e., a propane torch that does not deposit conductive contaminants 
on the product.

Clean burning torches include the Tyco Electronics FH-2629, 
FH-2649 (uses refillable propane cylinders) and FH-2618A (uses 
disposable cylinder).

Adjusting the Torch

Adjust regulator and torch as required to provide an overall 12- inch 
bushy flame. The FH-2629 will be all blue, the other torches will have 
a 3- to 4-inch yellow tip.  Use the yellow tip for shrinking.

Regulator Pressure

FH-2618A  

Full pressure

FH-2649  

25 psig

FH-2629  

15 psig

Cleaning the Cable

Use an approved solvent, such as the one supplied in the P63 Cable 
Prep Kit, to clean the cable.  Be sure to follow the manufacturer’s 
instructions.  Failure to follow these instructions could lead to 
product failure.

Some newer solvents do not evaporate quickly and need to be 
removed with a clean, lint-free cloth.  Failure to do so could change 
the volume resistivity of the substrate or leave a residue on the 
surface.  Please follow the manufacturer’s instructions carefully.

General Shrinking Instructions

•  Apply outer 3- to 4-inch tip of the flame to heat-shrinkable material 

with a rapid brushing motion

•  Keep flame moving to avoid scorching
•  Unless otherwise instructed, start shrinking tube at center, 

working flame around all sides of the tube to apply uniform heat

To determine if a tube has completely recovered, look for the following, 
especially on the back and underside of the tube:
1.  Uniform wall thickness
2.  Conformance to substrate
3.  No flat spots or chill marks
4.  Visible sealant flow if the tube is coated

Note:

  When installing multiple tubes, make sure that the surface of 

the last tube is still warm before positioning and shrinking the next 
tube.  If installed tube has cooled, re-heat the entire surface.

Содержание HVSA-3-1580S Series

Страница 1: ...tive contaminants on the product Clean burning torches include the Tyco Electronics FH 2629 FH 2649 uses refillable propane cylinders and FH 2618A uses disposable cylinder Adjusting the Torch Adjust r...

Страница 2: ...wire have equivalent cross section to cable metallic shield Additional braid may be needed for LC shield lead sheath cables or if external grounding or shield interrupting is required Raychem HVS EG...

Страница 3: ...res Grounding Conductor s P OL Y 4 102mm 178 4 Prepare lead sheath Abrade the lead sheath and clean with oil free solvent as shown PILC Abrade lead oxide and clean 16 406mm Lead Sheath 653 5 Remove le...

Страница 4: ...nal Width H PILC 105 9 Position OBT shrink in place Place an Oil Barrier Tube OBT over each phase butted to the lead sheath or belt paper cutback Shrink the three OBTs in place starting at the lead sh...

Страница 5: ...203mm HVSA 3 1584S 8 1 2 216mm OBT Insulation I C L PILC 220 14 Clean OBTs Using an approved solvent clean the OBT Insulation as shown OBT Insulation Clean PILC 222 15 Install SRM insert Assemble SRM...

Страница 6: ...he finished SRM diameter should not exceed that of the breakout installed in the next step PILC Stretch SRM to 1 2 Original Width 358 20 Position conductive breakout shrink in place Position the condu...

Страница 7: ...remaining backing strip tightly wrap the SRM around the connector and exposed conductor Be sure to fill the gaps and low spots around the connector Continue to wrap the SRM onto the insulation as sho...

Страница 8: ...tive tube Repeat Steps 25 30 for the remaining two phases Black Stress Control Tube 309 29 Apply Discharge Control Compound DCC Snip open the end of the DCC ampule and apply a thin film of compound ov...

Страница 9: ...ons to these instructions 33 Apply red sealant Remove backing from red sealant Using light tension wrap sealant over the cable butted against the red insulating tube as shown Build the sealant to the...

Страница 10: ...spring clamp over the braid 3 Fold the braid back over the spring clamp wraps Continue to wrap the remaining clamp over the braid Tighten clamp by twisting it in the direction it is wrapped and secur...

Страница 11: ...area and center on the exposed cable armor and lead sheath Bind the ends of the armorwrap to the cable armor and lead sheath with the tape provided Abrade and solvent clean cable jackets as shown to p...

Страница 12: ...eating Note Green heat sensitive paint will turn black as sleeve shrinks in place This completes the splice Note Allow to cool before moving or placing in service Adhesive Flow both ends White indicat...

Отзывы: