background image

WARNING

2008-37 Prestige Conc_AIrVentSup.

This document is intended to be used by a qualified heating contractor or service
technician.  Read all instructions within this document and within the PRESTIGE
Boiler  Installation  and  Maintenance  Manual,  before  proceeding  with  the  installa-
tion.  It is recommended to follow the procedures in the steps given, skipping or
missing  procedural  steps  could  result  in  severe  personal  injury,  death  or  sub-
stantial property damage.

Installation  of  this  boiler  must  comply  with  local  requirements  and  codes  and
with the National Fuel Gas Code NFPA 54, ANSI Z223.1 for installations within the
U.S.  For installations in Canada the installation must comply with CSA B149.1 or
B149.2

NOTICE

prestige

Solo 399

Concentric Vent/Air System Supplement

Date: 3/1

6

/09

Summary of Contents for Prestige Solo 399

Page 1: ... recommended to follow the procedures in the steps given skipping or missing procedural steps could result in severe personal injury death or sub stantial property damage Installation of this boiler must comply with local requirements and codes and with the National Fuel Gas Code NFPA 54 ANSI Z223 1 for installations within the U S For installations in Canada the installation must comply with CSA ...

Page 2: ...mponents 3 SECTION II VENT AIR SYSTEM INSTALLATION Vent Air System Clearance Requirements 4 Determine Termination Location 4 Boiler Vent Air System Adapter 5 Vent Air System Joint Assembly 5 Termination Installation 6 Cutting Termination Fitting to Length 7 Adjustable Length Vent Air System Pipe 7 Fire Stop Support Plate 8 Multiple Vent Air System Terminations 8 SECTION III MAINTENANCE PROCEDURES ...

Page 3: ...ce of potential hazards or to important information concerning the product Triangle Tube reserves the right to modify the technical specifications and components of its prod ucts without prior notice NOTICE This supplement is intended for the installation of a Concentric Vent Air System with a Prestige SOLO 399 Boiler The Concentric Vent Air System is not intended for installation with any other P...

Page 4: ...equire ment could cause vent failure resulting in leakage of flue products into the living space of the building WARNING Do not connect more than a single boiler into the vent air system All penetrations of the vent air system through ceil ings floors or walls must be properly fire stopped Check with local codes and requirements regarding fire stops and vent penetrations The vent air system must n...

Page 5: ...Air System Kit Dimensions Fig 3 Optional Vent Air System Components Clamp Hanging PSVCLP01 Clamp Seal PSVCLP02 Adjustable Length 12 4 to 17 PSVPIP01 Elbow 90º PSVELB01 Elbow 45º PSVELB02 Pipe 40 Fixed PSVPIP02 Fire Stop Support PSVSUP01 Inner Pipe Gasket Not Shown PSVGSK01 ...

Page 6: ...ination For each 90º elbow in the system the equivalent length is reduced by 10 feet For each 45º elbow in the system the equivalent length is reduced by 5 feet 2 The installer must consider the following when determining the location of the vent air system termination a Locate the termination where flue vapors will not damage surrounding shrubs plants or air conditioning equipment or be objec tio...

Page 7: ...re the outer sections together where they overlap Install screws 90º apart from one another No pre drilling is required NOTICE Vent Air System Installation 4 Horizontal or vertical runs of the vent air sys tem must be supported at every joint The installer should use the Hanging Clamp PSV CLP01 or perforated metal strap hangers or equivalent to support the piping 5 The vent air system must termina...

Page 8: ...unt the termination fitting through the interi or support plate from the exterior side of the wall Ensure the air inlet holes of the termina tion fitting are facing down and that the fitting is mounted level To determine the appropriate length of the termination fitting mount the exterior sup port plate temporarily prior to the installation of the interior support plate Insert the termi nation fit...

Page 9: ...e should be 3 4 less than the inner pipe 5 Cut through the outer pipe ONLY using a hack saw minimum 32 teeth per inch or snips 6 File off any burrs or rough edges on both pipes Clean off any dust or dirt 7 If the cutting process distorted the roundness of the pipes carefully use your thumbs to correct the distortion When cutting or correcting the shape of the outer pipe WEAR GLOVES The ends of the...

Page 10: ...he concentric pipe through the plate Secure the pipe to the Fire Stop Support Plate using only the self drilling screws provided through the plate tabs and into the concentric pipes outer jacket The Support Plate provided in the Concentric Vent Air System Kit PSVKIT03 does not contain tabs for securing the pipe to the plate where the Fire Stop Support Plate does 4 Seal around the support plate whe...

Page 11: ...pect the vent air system annually for blockage deterioration or leakage Immediately repair any joints that show signs of deterioration or leakage with the boiler turned off Failure to inspect the vent air system and have any conditions repaired can result in severe personal injury or death WARNING ...

Page 12: ...eight Available in 5 sizes that can accommodate any size pool or spa For domestic water snow melting radiant floor refrigeration Plates made of stainless steel with a 99 9 copper and brazed ensuring a high resistance to corrosion Self cleaning and self descaling Computerized sizing available from Triangle Tube Phase III Available in capacities from 25 000 BTU hr to 5 000 000 BTU hr 95 AFUE Energy ...

Reviews: