background image

 

                                                            

 

Dual Swing Gate Opener 

User’s Manual 

 

Model: 

 

 

 

 

 

 

 

 

 

 

 

TOPENS Website 

http://www.topenstool.com/ 

 

 
 

 

   

VER 20a 

 

KD702 

 

Please read and follow all warnings, precautions and instructions before 
installation and use. 

 

Never connect the solar panel to the control board directly to charge the battery. 

 

Periodic checks of the opener are required to ensure safe operation. 

 

Save this manual. 

C030407 

Summary of Contents for KD702

Page 1: ...VER 20a KD702 Please read and follow all warnings precautions and instructions before installation and use Never connect the solar panel to the control board directly to charge the battery Periodic ch...

Page 2: ...on for Installation 6 Install the Gate Opener on the Gate 6 Mounting the Control Box 10 Connection of Power Supply 11 Connecting of the Control Board 11 How to Program or Erase the Remote 13 How to Us...

Page 3: ...destrian access shall be located such that persons will not come in contact with the moving vehicular gate 8 Pedestrians should never cross the pathway of a moving gate The gate opener is not acceptab...

Page 4: ...er or other underground utility lines contact underground utility locating companies BEFORE digging SAVE INSTRUCTION 14 Do not permit children to play on or around the gate and keep all controls out o...

Page 5: ...Accessories Parts List Available at TOPENS Store Tools Needed Power Drill Tape Measure Open End Wrenches 14 17 or Adjustable Wrenches Wire Strippers C Clamps small medium and large Level Hacksaw or He...

Page 6: ...ual Single gate running mode Adjustable opening closing interval between master and slave gate Stop in case of obstruction during gate opening Reverse in case of obstruction during gate closing Built...

Page 7: ...stallation Overview Important The second gate opener cable should be put into the PVC conduit not provided which is buried underground This protects the cable from lawn mowers and string trimmers Rev...

Page 8: ...ckets to wooden posts a larger size washer or metal plate should be used between the bolts and the wooden post to ensure the stability of the fastening hardware If the post is smaller than 6 diameter...

Page 9: ...te opener insert the release key and turn the key 90 clockwise This releases the motor and allows the push pull rod to be manually extended and retracted To restore normal operation turn the key 90 co...

Page 10: ...f there is not at least 2 5cm of clearance or if the opener and the Post Pivot Bracket are binding rotate the Post Pivot Bracket and or move the Post Bracket Assembly to obtain the minimum clearance a...

Page 11: ...ach bolt with one 10 washer one 10 lock washer and one 10 nut 9 Attach the gate brackets to each gate by inserting two M10 x 75 bolts through the gate brackets and the drilled holes in the gates Faste...

Page 12: ...of designed for safety reason and a longer service life it is recommended to install the control box inside a secure surface and at least 100 cm 40 inches above the ground to avoid being flooded or bu...

Page 13: ...s from lawn mowers weed eaters and grazing animals 4 The fuse in the control board is interchangeable A 10a 250vac 5 20mm fuse is suitable to the control board Connecting of the Control Board Motor co...

Page 14: ...12...

Page 15: ...rminals in parallel Use another 2 core cable to connect the COM terminal of the receiver to the 15 terminal the NC terminal to the 16 terminal Push Button optional The push button should be wired to t...

Page 16: ...ate opener Every press of the button is able to active the gate opener to work alternately open stop close stop open 2 Use one remote to operate TOPENS swing gate opener sliding gate opener at the sam...

Page 17: ...he single or dual gate is chosen The Digital Display will indicate P2 Now single dual gate set is finished Factory set is 11 3 Master Slave Gate Set When Digital Display indicates P2 the gate opener i...

Page 18: ...h indicates the interval time 0 means the Master and Slave gates close simultaneously 1 means the Slave Gate starts to close 1 second before Master gate starts to close Maximum close interval is 9 sec...

Page 19: ...INC or DEC button the Digital Display will show a 01 99 which indicates the current automatic closing time The minimum time is 1 second 99 seconds maximum Each time you press and release the INC butto...

Page 20: ...n or u respectively When the motor is not running the Digital Display indicates Adjusting the Limit Switch Adjusting the Limit Switch of Actuator 1 The position of Limit Switch A was fixed in factory...

Page 21: ...ection and service should always be performed anytime a malfunction is observed or suspected 2 It is suggested that while at the site voltage readings be taken at the operator Using a Digital Voltmete...

Page 22: ...connections and operation for safety devices 3 Remove the BLUE GREEN YELLOW wires of the arm from the control board and use a jumper wire to short the ULT COM DLT terminals of the control board which...

Page 23: ...21 Quick Setting Guide...

Page 24: ...22...

Page 25: ...23...

Page 26: ...24...

Page 27: ...e do not hesitate to contact us E mail support topenstool com Kindly include your Product Model Purchasing Date Site Order and your contact information All your concerns will be replied within 24 hour...

Reviews: