background image

 

 

TOWER PARTS KIT Installation Instructions 

ETP-MT | ETP-MTE | ETP-MT/R

 

 

 

Page 

1

 of 

4

 

 

 

Rev. 1/27/2017

 

 

Copyright 2017 Talkaphone

 

• 7530 North Natchez Avenue • Niles, Illinois 60714 • Phone 773.539.1100 • [email protected] • www.talkaphone.com.  

All prices and specifications are subject to change without notice. Talk-A-Phone, Scream Alert, WEBS and WEBS Contact are registered trademarks of Talkaphone All rights reserved.

 

I. 

Introduction 

This manual is for the Blue Light Emergency Phone Tower (model 

ETP-MT

), Radius Emergency Phone 

Tower (model

 ETP-MT/R

) and the ECO TOWER® Emergency Phone Tower (model 

ETP-MTE

) installation 

only.  For instructions on installing the anchor bolts into the foundation, see the 

TOWER ANCHOR BOLT 

INSTALLATION INSTRUCTIONS

 or 

ETP-PDMK

 

INSTRUCTIONS

 for Parking Deck Mounting Kits. 

II. 

Contents 

Before beginning installation, make sure you have all the included components.  Each 

TOWER PARTS

 kit 

includes: 

Qty.  Part Number 

Description 

42941 

10-24 x 3/4" Pin-In-Torx Pan head(TS-20 driver required) 

42843 

6-32 hex nut 

68590 

LED Panel Light (12-24V AC/DC - 120VAC) 

ETP-EL 

or

 

ETP-EL12/24 

120VAC LED Blue Light 

or

 

12/24V AC/DC LED Blue Light 

III. 

Installation 

 

 

 

It is the installer’s obligation to ensure compliance with all national, regional, 
and local regulations. 

1. 

After removing the tower from its shipping carton, install the LED Blue Light on top of the tower, feeding 
the power cord and control wires through the top of the tower. If installing an 

ETP-MT/R 

tower series, 

you will need to remove the cap plate atop the tower first.  Fasten the LED Blue Light to the tower with 
three (3) 10-24 pan head tamperproof screws.  Replace the cap plate at the top, if used. 

It is not 

necessary to connect power lines at this point. 

 

2. 

Slide the LED Panel Light over the studs with the LEDs facing down. Tighten down using the two (2) 6-
32 hex nuts (provided).  Be careful not to over tighten to avoid cracking the LED Panel Light. 

 

3. 

Install one 3/4”-10 hex nut and one washer (found in the 

MT/R BOLT KIT

 or 

MT BOLT KIT

on each 

anchor bolt 2.5-

3.5” above grade to top of washer.  This will allow for a 1/2" air gap between the 

foundation and the tower, which will allow airflow and prevent moisture problems.  Verify that the nuts 
are level (0° pitch).    

– 

See 

Figure 1

 

– 

 

THIS PRODUCT MUST BE INSTALLED IN ACCORDANCE WITH THE 
APPLICABLE INSTALLATION CODE BY A PERSON FAMILIAR WITH THE 
CONSTRUCTION AND OPERATION OF THE PRODUCT AND THE HAZARDS 
INVOLVED  

CE PRODUIT DOIT ÊTRE INSTALLÉ SELON LE CODE D’INSTALLATION 
PERTINENT, PAR UNE PERSONNE QUI CONNAÎT BIEN LES PRODUIT ET 
SON FONCTIONNEMENT AINSI QUE LES RISQUES INHÉRENTS 

Reviews: