background image

 

 

 
 
 
 
 
 
 
 

  

 
 
 

 

PLE-30-080 Chainhoist Controller       V1 

Highlite International B.V. – Vestastraat 2 – 6468 EX – Kerkrade – the Netherlands 

Ordercode: 70237 

MANUAL 

ENGLISH 

Summary of Contents for 70237

Page 1: ...PLE 30 080 Chainhoist Controller V1 Highlite International B V Vestastraat 2 6468 EX Kerkrade the Netherlands Ordercode 70237 MANUAL ENGLISH ...

Page 2: ...Description of the device 6 Features 6 Frontside 6 Functional Description 8 Installation 9 Set Up and Operation 9 Forward Rotation Up 9 Backwards Rotation Down 9 Idle Position 0 9 Emergency Stop 9 Pin Assignment for a 16 pin Harting socket 10 Maintenance 10 Troubleshooting 11 Connection Diagram 12 Declaration of Conformity 13 Product Specifications 14 Dimensions 15 ...

Page 3: ...trical installation follow the instructions of this manual This device contains no user serviceable parts Refer servicing to qualified technicians only Before your initial start up please make sure that there is no damage caused by transportation Should there be any consult your dealer and do not use the device To maintain perfect condition and to ensure a safe operation it is absolutely necessary...

Page 4: ...ckside of the unit for ventilation Always disconnect power from the mains when device is not used or before cleaning Only handle the power cord by the plug Never pull out the plug by tugging the power cord Make sure that the available voltage is not higher than stated on the rear panel Make sure that the power cord is never crimped or damaged Check the device and the power cord from time to time I...

Page 5: ...xceed 50 at the maximum ambient temperature of 40 C If this device is operated in any other way than the one described in this manual the product may suffer damages and the warranty becomes void Any other operation may lead to lethal injuries You endanger your own safety and the safety of others Rigging Please follow the European and national guidelines concerning rigging trussing and all other sa...

Page 6: ...our phone number 04 A brief description of the symptoms Claims The client has the obligation to check the delivered goods immediately upon delivery for any short comings and or visible defects or perform this check after our announcement that the goods are at their disposal Damage incurred in shipping is the responsibility of the shipper therefore the damage must be reported to the carrier upon re...

Page 7: ...dual motor output is rated for a maximum of 1kW and the total load of all motors summed should not exceed 6 9kW 4 x 4 pole CEE connectors and also 2x 16 pole multipin to connect a break out box Power Supply 400V 3P N PE Max voltage drop 20 and 10 Power Connector CEE 5 pole 32A Output Connector CEE 4 pole 16A 2x 16 pole multi connector HARTING Safety Emergency button Including ABS Transport case Ma...

Page 8: ... switch for pre selecting an individual hoist 08 Short circuit protection for power and control main circuit breaker 6A C 09 Mains switch 3 phase short circuit breaker 4x 10A D 10 L1 L2 L3 Phase failure indication neon lamps Setup Possibilities PLE 30 080 70237 1 4x red CEE for Motor 1 4 2 1x Harting for Motor 1 4 3 1x Harting for Motor 5 8 4 2x Harting for Motor 1 4 Motor 5 8 When the chainhoist ...

Page 9: ...e are allowed under on or in the vicinity of the load Make sure all people have left the operating area before you start to move any load 12 Make sure you have an unobstructed view on the entire travel path of the load Always keep an eye on the motors and workspace while operating the chainhoist controller 13 Pre select all hoists needed in the up or down direction 14 Turn the black RUN switch to ...

Page 10: ...TING sockets or 4 CEE sockets for output loading One 10 A residential circuit breaker and one 2 Amp MCB main circuit breaker are used for protection when a fault condition occurs or a voltage spike occurs The Forward Backward Rotation and Idle modes are available by turning the switch on the front of the controller Forward Rotation Up When the chainhoist controller is powered on select the desired...

Page 11: ...oroughly dry before linking equipment or supplying electric power The operator has to make sure that safety relating and machine technical installations are to be inspected by an expert after every year in the course of an acceptance test The operator has to make sure that safety relating and machine technical installations are to be inspected by a skilled person once a year The following points h...

Page 12: ...d Turn the emergency button clockwise to release Controller does not respond Solution Please check the powercable and the connections to the chainhoists Connect everything properly All 3 red neon lamps L1 L2 L3 must be ON Otherwise one of the phases is not present DO NOT HOIST Please check all 3 phases The main circuit breaker is switched OFF Set the main circuit breaker to ON Control circuit brea...

Page 13: ...12 Ordercode 70237 PLE 30 080 Chainhoist Contoller Connection Diagram ...

Page 14: ...13 Ordercode 70237 PLE 30 080 Chainhoist Contoller Declaration of Conformity ...

Page 15: ...onditional short circuit current of an assembly Icc 6kA Rated Diversity Factor RDF 1 Rated Frequency fn 50 60Hz Pollution Degree 3 Complies to standard IEC 61439 2 2011 Dimensions 514 x 414 x 195 mm LxWxH Weight 12 86 Kg Operation Power Connector CEE 5 pole 32A Output Connector 4x CEE 4 pole 16A 2x 16 pole multi connector HARTING Safety Emergency button Housing Compact strong metal housing Mains C...

Page 16: ...15 Ordercode 70237 PLE 30 080 Chainhoist Contoller Dimensions ...

Page 17: ...16 Ordercode 70237 PLE 30 080 Chainhoist Contoller ...

Page 18: ...17 Ordercode 70237 PLE 30 080 Chainhoist Contoller ...

Page 19: ...18 Ordercode 70237 PLE 30 080 Chainhoist Contoller ...

Page 20: ... 2020 Showtec ...

Reviews: