background image

 

SCISSOR LIFT FREE WHEELS  

GEMINI LOW PROFILE

 

 
 

 
 

OPERATING  

INSTRUCTIONS  

 

 

GLP99SM-GLP99SM/P

 

 

 

 

 

 

 

 

 

 
 
 

 

Summary of Contents for GLP99SM

Page 1: ...SCISSOR LIFT FREE WHEELS GEMINI LOW PROFILE OPERATING INSTRUCTIONS GLP99SM GLP99SM P...

Page 2: ...WITH THE FOLLOWING EUROPEAN DIRECTIVES 98 37 CEE 73 23CEE 93 68 CEE 89 336 IT ALSO DECLARES THAT THE FOLLOWING EUROPEAN RULES HAVE BEEN RESPECTED EN 292 1 EN 292 2 EN294 EN 349 EN 1050 EN 60204 1 ETS...

Page 3: ...N 291 1992 EN 292 1992 EN 294 EN349 EN1050 EN 60204 1 EN 300683 EN 55022B Only skilled and previously authorized technicians should be allowed to carry out transport assembling setting maintenance ove...

Page 4: ...sed versions They have been designed and built for car van lifting and placing operations Our car lifts are equipped as follows A BASE Fixed structure B BOOMS PLATFORM Lifting and travelling structure...

Page 5: ...be padlocked to prevent the use of the lift during the maintenance 1 position the lift is powered GLP99SM GLP99SMP double scissor car lifts are able to lift vehicles and van whose weight is no more t...

Page 6: ...he lift 4 Never use the lift without protection or when safety devices are off line 5 Always use the rubber pads when lifting a vehicle observing the proper points of support specified by the vehicle...

Page 7: ...LD BE ALLOWED TO INSTALL THE CAR LIFT SERIOUS DAMAGE TO PEOPLE OR EQUIPMENT CAN BE CAUSED IF THIS RULE IS NOT FOLLOWED The lift must be installed according to the specified safe distance from walls co...

Page 8: ...ctric card of the power unit WIRING CONNECTIONS POSITION N CODE DESCRIPTION 1 06 0302 Lifting limit switch 4 06 6607 Photoelectric cell 3 06 0302 P2 platform self levelling 5 06 0302 P1 platform self...

Page 9: ...9 WIRING DIAGRAMS...

Page 10: ...10 WIRING DIAGRAM...

Page 11: ...11 WIRING DIAGRAM...

Page 12: ...ORS K1 17 RELAIS D1 37 DIODS R1 44 RESISTORS DL LED SPRI BLEEPER S1 RESET TIMER BUTTON S2 TIMER REGULATOR IC4 TIMER MICROCHIP ICS BLEEPER MICROCHIP C1 24 CAPACITOR TR1 5 TRANSISTORS IC 1 2 3 5 VOLTAGE...

Page 13: ...4 3001 LEVELLING P2 DELIVERY C 04 3004 PIPE CONNECTION H P1 HYDRAULIC PLAN 1 PARACHUTE VALVE 6 3 5 L PUMP 2 LEVELLING ELECTRO VALVE EL 7 THREE PHASE MOTOR 4 HP 3 LOWERING ELECTRO VALVE EO 8 SUCTION FI...

Page 14: ...n power supply is disconnected to avoid the possibility of electrocution COMMERCIAL PARTS WIRING PLANT Position n Denomination Manufacturer Type Max Appl Proximity SIEMENS 10 30V DC pnp NC 0 3A Sn1 2m...

Page 15: ...tform so that they are in line with the lifting points specified by the manufacturer Press the lifting button keep it pressed until the required height is reached To lower the lift press the lowering...

Page 16: ...al capacity cannot be lifted Max pressure valve malfunction Suction filter malfunction Worn pump Contact service dept Clean the suction filter or contact service dept Replace the pump Platform out of...

Page 17: ...icated on chapter 3 and 6 when making the substitution of the spare parts and the repair intervals Spare parts ordering procedure When ordering spare parts the following must be clearly specified Car...

Page 18: ...18...

Page 19: ...19 FIG 3 LEVERS AND PISTON FIG 4 PLATFORM...

Page 20: ...20 FIG 5 CONTROL BOX...

Page 21: ...21 FIG 6 ELECTRIC COMPONENTS FIG 7 SAFETY ELEMENTS FIG 8 RAMPS...

Page 22: ...RICTION WASHER 16 17 02 2229 LOWER BOOM COUPLING PIN 4 18 03 3525 25x28x30 SELF LUBRICATIN BUSHING 24 19 02 2209 BOOM FASTENING PIN 8 20 01 2214 SLEIGHT 4 22 01 2215 NYLON SKATE 4 23 02 2224 HOSE SUPP...

Page 23: ...X16 TCEI BOLT 3 33 04 4598 ACCOUPLEMENT JOINT 1 34 05 5000 AIR ELECTROVALVE 1 35 05 4040 AIR FILTER 1 36 05 5512 90 1 8 x 6 UNION ELBOW 2 37 05 5514 AIR ELECTROVALVE CONNECTOR 1 FIG 6 ELECTRIC COMPONE...

Page 24: ...om walls columns ceiling other machines etc 3 Power supply line check 4 Lift levelling check 5 Lift working check 6 Hydraulic safeties working check 7 Electric safeties working check 8 Loaded lift che...

Page 25: ...t of visit Positive Negative Installer Stamp and signature User Stamp and signature Date Next test on RECURRING OR OCCASIONAL VISIT N DESCRIPTION OF TEST YES NO Notes 1 Lift maintenance and cleaning c...

Page 26: ...tic failure check 4 Safety devices working check MONTLY TESTS 1 Lift through cleaning 2 Rollers slides check 3 Cylinders air bleeding if necessary HALF YEARLY TESTS 1 Oil level check 2 High pressure f...

Page 27: ...Stamp and signature REPAIR FAILURE ACTION Date Stamp and signature October 2000 BY THE GRAPHIC DEPARTEMENT A R ROTARY LIFT EUROPE S r l Via Tiburtina Km209 800 65025 Manoppello Scalo PESCARA ITALY Te...

Reviews: