background image

 

      7014-285C 

     August 

1, 

2018

R

CB1200 PELLET INSERT APPLIANCE

 

MODEL: 

CB1200MI-MBK

Installation Manual

Installation & Appliance Set-Up

INSTALLER: Leave this manual with party responsible for use and operation. 

OWNER: Retain this manual for future reference. 

NOTICE: DO NOT DISCARD THIS MANUAL

NOTE

To obtain a French translation of this manual, please contact 

your dealer or visit 

www.quadrafire.com

Pour obtenir une traduction française de ce manuel, s’il vous 

plaît contacter votre revendeur ou visitez 

www.quadrafire.com

Installation and service of this appliance should be performed by 

qualified personnel. Hearth & Home Technologies recommends 

HHT Factory Trained or NFI certified professionals.

CAUTION

Tested and approved for wood pellets and corn pellets. 

Burning of any other type of fuel voids your warranty.

CAUTION

Check building codes prior to installation.

•  Installation MUST comply with local, regional, state 

and national codes and regulations.

• 

Consult local building, fire officials or authorities 

having jurisdiction about restrictions, installation 

inspection, and permits.

HOT SURFACES! 

Glass and other surfaces are hot during 

operation AND cool down.

WARNING

Hot glass will cause burns.

• 

Do not touch glass until it is cooled

• 

NEVER allow children to touch glass

• 

Keep children away

• 

CAREFULLY SUPERVISE children in same room as 

fireplace.

• 

Alert children and adults to hazards of high temperatures

•  High temperatures may ignite clothing or other 

flammable materials.

• 

Keep clothing, furniture, draperies and other flammable 

materials away.

 

WARNING

If the information in these instructions is 

not followed exactly, a fire could result 

causing property damage, personal 

injury, or death.

 

• 

Do not store or use gasoline or other flammable 

vapors and liquids in the vicinity of this or any other 

appliance.

• 

Do not over fire - If appliance or chimney connector 

glows, you are over firing. Over firing will void your 

warranty.

•  Comply with all minimum clearances to combustibles 

as specified.  Failure to comply may cause house 

fire.

Содержание CB1200

Страница 1: ... state and national codes and regulations Consult local building fire officials or authorities having jurisdiction about restrictions installation inspection and permits HOT SURFACES Glass and other surfaces are hot during operation AND cool down WARNING Hot glass will cause burns Do not touch glass until it is cooled NEVER allow children to touch glass Keep children away CAREFULLY SUPERVISE child...

Страница 2: ...ies Needed 6 D Inspect Appliance and Components 6 E Install Checklist 7 3 Dimensions and Clearances 8 A Appliance Dimensions 8 B Clearance To Combustibles UL and ULC 9 C Minimum Opening for Masonry 10 Zero Clearance Fireplaces 10 D Hearth Extension 10 E Floor Protection 11 F Installation into a Factory Built Fireplace 12 G Installation into a Masonry Fireplace 13 H Prefabricated Metal Chimney 13 4...

Страница 3: ...r operation It is against federal regulations to operate this pellet insert in a manner inconsistent with operating instructions in this manual B BTU Efficiency Specifications EPA Certification 972 14 EPA Certified Emissions 1 3 grams per hour LHV Tested Efficiency N A HHV Tested Efficiency N A EPA BTU Output 11 500 to 34 600 hr BTU Input 15 500 to 46 400 hr Vent Size 3 4 or 6 inches L or PL Hoppe...

Страница 4: ...ion air inlet is provided The structural integrity of the mobile home floor ceiling and walls must be maintained The appliance must be properly grounded to the frame of the mobile home and use only Listed pellet vent Class L or PL connector pipe Outside Air Kit part OAK ACC must be installed in a mobile home installation F Non Combustible Materials Material which will not ignite and burn composed ...

Страница 5: ... use of chimney offsets Place the appliance where there will be a clear passage for a Listed chimney through the ceiling and roof vertical or through exterior wall horizontal Installing the required outside air kit will affect the location of the vent termination When locating vent and venting termination the ideal location is to vent above roof line when possible This minimizes the affects of win...

Страница 6: ... carefully during the installation to ensure maximum safety and benefit Follow pipe manufacturer instructions for installation and air clearance requirements WARNING Fire Risk Damaged parts could impair safe operation Do NOT install damaged incomplete or substitute components WARNING Hearth Home Technologies disclaims any responsibility for and the warranty will be voided by the following actions ...

Страница 7: ...ation and copying this checklist for your file That this checklist remain visible at all times on the appliance until the installation is complete Electrical 120 VAC unswitched power provided to the appliance Check outlet with multi meter for proper polarity and voltage 115 120 VAC Record voltage reading _____________ ATTENTION INSTALLER Follow this Standard Work Checklist This standard work check...

Страница 8: ...0mm 28 1 2 in 724mm 13 5 8 in 346mm 8 3 4 in 223mm Figure 8 5 Front View with large panel set SP CB12I3350 GD NB or NL SIDE WALL 24 5 16 in 618mm 50 in 1270mm 33 in 838mm 10 3 8 in 264mm 21 1 4 in 539mm 21 1 4 in 539mm 40 in 1016mm 30 in 762mm 10 3 8 in 264mm 21 1 4 in 539mm 21 1 4 in 539mm 25 1 2 in 648mm 11 in 279mm 24 in 609mm 19 1 2 in 22 in 496mm 559mm 11 in 280mm 25 1 2 in 649mm 11 in 279mm ...

Страница 9: ...From finished floor protection The size of your floor protector choice must be added to this dimension If using Quadra Fire floor protector Part 811 0730 allow 1 1 2 inches 38mm 25 in 635mm 25 in 635mm 29 3 4 in 756mm 15 1 2 in 394mm Figure 9 1 NOTE A Quadra Fire floor protector Part 811 0730 is available through your dealer to be used as a floor protector for the section under the insert body onl...

Страница 10: ...1 4 337 Height The Classic Bay 1200 Insert has the option of an adjustable hopper from 22 inches for the maximum to 19 1 2 inches for the minimum Add a 1 4 inch to the adjustment for clearances for any measurement in between the maximum and the minimum height The Maximum and minimum are already calculated for you in the above table for convenience D Hearth Extension Use a Type II non combustible f...

Страница 11: ...l to the combustible material beneath it The R value of a material must be equal or larger then the required R value to be acceptable NOTE A Quadra Fire floor protector Part 811 0730 is available through your dealer to be used as a floor protector for the section under the insert body only Floor protection to front and sides of insert appliance must be supplied in addition to this part E Floor Pro...

Страница 12: ...ower than the fireplace opening the portion of the insert extending onto the hearth must be supported Manufacturer designed adjustable support kit can be ordered from your dealer The following is only one example as there are many different models of factory built fireplaces Keep sharp edge of metal floor away from power cord Figure 12 4 Place the insert into the factory built firebox Ensure that ...

Страница 13: ...er must be installed from the appliance flue collar to the chimney top The liner must be securely attached to the insert flue collar and the chimney top The air flow of the factory built zero clearance fireplace system must not be altered The flue liner top support attachment must not reduce the air flow for the existing air cooled chimney system No dilution air is allowed to enter the chimney Ris...

Страница 14: ...nces and protruding parts of the structure P 12 in Clearance above roof line for vertical terminations All minimum clearances are listed with an Outside Air Kit OAK installed unless otherwise noted in table below 24 in Above grass top of plants wood or any other com bustible 12 in 36 in no OAK Clearance from any forced air intake of other appli ance 12 in Clearance horizontally from combustible wa...

Страница 15: ...st of the demands of the pellet appliance but consideration must be given to the total house demand House demand may consume the air needed for the appliance It may be necessary to add additional ventilation to the space in which the pellet appliance is located Consult with your local HVAC professional to determine the ventilation demands for your house Vent Configurations When installing a pellet...

Страница 16: ... Quadra Fire Outside Air Kit must be used with manufactured home installations 3 Residential The 3 inch 76mm vertical Top Vent Adapter Kit and the 3 to 6 inch 76 152mm Top Vent Offset Adapter are tested to use 24 gauge single wall flue connector or Listed double wall flue connector to Class A Listed metal chimneys or masonry chimneys meeting International Residential Code standards for solid fuel ...

Страница 17: ...t The chart will help you in determining proper venting size according to the equivalent feet of pipe calculated previously and the altitude above sea level of this installation Figure 16 2 a Locate the calculated equivalent feet of pipe on the vertical left side of the chart b Move to the right horizontally on the chart until you reach your altitude above sea level c If you fall below the diagona...

Страница 18: ...ir from Wall floor or ceiling cavity Enclosed space such as an attic or garage NOTE Illustrations reflect typical installations and are FOR DESIGN PURPOSES ONLY Illustrations diagrams are not drawn to scale Actual installation may vary due to individual design preference Outside Air through Rear Wall Horizontal NOTE Use metal plate around exhaust vent pipe and seal all edges with non flammable ins...

Страница 19: ...28 ORD ULC C1482 M1990 Figure 19 1 Outside Air Termination at Chimney Top Vertical 305mm min below 305mm min above NOTE Use metal plate around exhaust vent pipe and seal all edges with non flammable insula tion such as mineral wool or ceramic Do not use high temperature caulk ing materials to seal any edge to prevent furture serviceability NOTE In Canada this fireplace insert must be installed wit...

Страница 20: ... Figure 20 5 Figure 20 3 Attach bolts and nuts in these locations Figure 20 1 Figure 20 2 Remove top vent adapter from the this adapter Use the two holes Use the two holes Note for the follow step verify the use of the correct hole placement for the filler piece attachment Verify gasket is installed between adapters before moving onto the next step Failure to do so may cause leaking of soot and sm...

Страница 21: ...into the filler piece Figure 21 1 5 Install the Rear Panel using six screws Figure 21 2 6 Install the cover plate over the top vent opening using 4 screws Figure 21 3 7 Attach the left shroud panel using eight screws Figure 21 4 8 Assemble the right shroud panel corner and the right shroud panel using 3 screws Figure 21 5 9 Attach the right panel assembly using 4 screws to appliance Figure 21 6 10...

Страница 22: ... wall Cut a 2 1 2 to 3 inches 64 76mm opening on inside wall and a 3 to 3 1 2 inch 76 89mm opening on outside of house 3 Use hose clamp to secure flex pipe to collar assembly 4 Slide trim ring over flex pipe and run pipe through wall 5 Attach hose to outside termination cap with second hose clamp 6 Secure termination cap to outside surface 7 Secure trim ring to interior wall CAUTION Never draw out...

Страница 23: ...s to hold in place using Phillips head screw driver Figure 24 2 on page 24 3 Measure front and side trims to required height to cover scissors and mark pieces for cutting Cut excess material from top of trims edge not bottom This edge will be sharp wear gloves to prevent injury to your hands Figure 24 3 on page 24 4 Using sheet metal shears cut trim along the marked edge The cut edge fits under li...

Страница 24: ...acket Left Trim Right Trim Right Panel Left Panel Right Side Curtain Left Side Curtain Top Panel Figure 24 4 Figure 24 5 NOTE Right and left side curtains are shipped with the insert 1 Unpack and lay out parts face down flanges up on a non abrasive surface as shown in Figure 24 4 Install 1 8 32 x 3 8 inch screw into bottom tab of side panel Figure 24 5 2 Set the large hole at bottom of side curtai...

Страница 25: ... in Figure 25 6 into locater hole in floor of insert Figure 25 6 6 Lift hopper lid and press down on panel top while installing 4 8 32 x 3 8 inch screws into holes in panel support If screws have been factory installed tighten to secure panel to panel support Return hopper lid to closed position 7 Install a corner bracket on each side trim piece Slide brackets into top trim from each side and secu...

Страница 26: ... run more than 25 make sure you use a continuous strand of 18 to 22 gauge thermostat wire For optimum performance your thermostat should be Mounted on an inside wall approximately 5 above the floor Do not locate where there is poor air circulation such as in a corner alcove behind doors bookcase or other objects Located away from drafts direct sunlight above a lamp television radiator a wall next ...

Страница 27: ...are wire ends are held ALL the way into the terminal block while the screws are being tightened 6 There are two AA ALKALINE ONLY batteries already installed into the thermostat to activate remove black plastic tab that is located inside the battery compartment 7 Snap the thermostat to the base plate Figure 27 2 Figure 27 3 Terminal Block Center 2 Screws for Thermostat Wires Power Outlet Figure 27 ...

Страница 28: ...e warranty 1 Place the front log in first as shown in Figure 28 1 charred area surrounding fire pot 2 Set the left and right logs onto the front log placing the holes in the base of the left and right logs over the locating pins in the front log See Figure 28 2 Ensure that the charred ends are facing the fire pot LOCATING PINS Charred Areas in the Back Top Log Right Top Log Left Front Log Figure 2...

Страница 29: ...ith the Manufacturers Home Safety Standard HUD CFR 3280 Part 24 Spark Arestor Cap Roof Flashing Storm Collar Joist Shield Firestop Double Wall Connector Pipe Figure 29 1 CAUTION THE STRUCTURAL INTEGRITY OF THE MOBILE HOME FLOOR WALL AND CEILING ROOF MUST BE MAINTAINED Do NOT cut through Floor joist wall studs or ceiling trusses Any supporting material that would affect the structural integrity Thi...

Страница 30: ...30 7014 285C August 1 2018 CB1200 Pellet Insert 8 Reference Materials A Service Maintenance List Date of Service Performed By Description of Service ...

Страница 31: ...August 1 2018 7014 285C 31 CB1200 Pellet Insert Date of Service Performed By Description of Service ...

Страница 32: ...32 7014 285C August 1 2018 CB1200 Pellet Insert B Accessory List ...

Страница 33: ...August 1 2018 7014 285C 33 CB1200 Pellet Insert ...

Страница 34: ... and maintenance instructions included Read understand and follow these instructions for safe installation and operation Leave this manual with party responsible for use and operation of this appliance We recommend that you record the following pertinent information for your heating appliance Date purchased installed Serial Number Location on appliance Dealership purchased from Dealer Phone 1 Note...

Отзывы: