background image

Fixture Installation

Orbital Shower Panel R3

5-06-0009

Publication date 2021-08-27

Summary of Contents for OAS Standart R3

Page 1: ...Fixture Installation Orbital Shower Panel R3 5 06 0009 Publication date 2021 08 27 ...

Page 2: ... document may be reproduced or copied in any form or by any means without written permission from Orbital Systems The English language version of this document contains the original instructions All other language versions are translations of the original instructions ...

Page 3: ...rview 11 Kit Measurements 12 Crucial Kit Measurements 13 Prepare Shower Area 14 Install Drain 15 Install Wall Brackets 17 Install Wallbox 19 Prepare Orbital Systems Shower Head 22 Prepare 3rd Party Shower Head 22 Pipes and Connections 22 Prepare for Tiling 24 Apply Waterproofing Membrane 25 For installations outside of Sweden 25 For installations in Sweden 26 Apply Waterproofing Membrane 26 Instal...

Page 4: ...This page is intentionally left blank Page 4 of 33 ...

Page 5: ...g Planning regulations BBR The system is type approved according to RiSE Research Institutes of Sweden AB with Type Approval Certificate C900373 C900374 Orbital Shower is CE marked based on test reports from third party labs If industry regulations and instructions in this manual are followed Orbital Systems guarantees a functional shower system Page 5 of 33 ...

Page 6: ...consent Defects that appear under conditions of operation not provided for and under improper use of the product Defects caused by faulty or non occurring maintenance incorrect installation or a faulty repair For showers outside of the warranty period spare parts are available for purchase directly from Orbital Systems Service Orbital Systems and our team of expert staff are available to assist yo...

Page 7: ...ply wire Min 2 5 mm2 rated for 16A circuit Plumbing Water Incoming water supply connections Separate hot and cold 2x female G 1 2 swivel nut Incoming cold water temp min max 4 25 C Incoming hot water temp min max 50 65 C Incoming water pressure min max 2 10 bar The supply pressure is the fundamental requirement for the shower flow 2 bar 7 5 litres min 3 bar 9 5 litres min 4 bar 11 litres min Recom...

Page 8: ...wer Head Wallbox HxWxD 932x538x145 mm Drain Unit HxWxD 192x812x184 mm Drain Connection Ø75 mm Product Measurements Ø 75 mm 932 mm 600 mm 812 mm 440 mm Orbital Systems Shower Head Hand Shower CAUTION Make sure the wall is wide enough min 450 mm from center of Control Dial to fit the Diverter and Hand Shower 955 mm 406 mm 434 5 mm Page 8 of 33 ...

Page 9: ...2190 mm 575 mm 150 mm 1265 mm 230 mm 184 mm 145 mm mm 122 mm Page 9 of 33 ...

Page 10: ...Recycling Optimisation Site Suggestion Recommended installation A fully enclosed shower area with floor heating is recommended to optimize recirculation rates Page 10 of 33 ...

Page 11: ...0 Outlet Unit RSK 711 99 33 11 Drain Waterproofing Cuff 12 Antenna Provided by Customer 1 Waterproofing Conduit Membrane cc40 for Diverter 2 Waterproofing Conduit Membrane for Shower Head 3 Waterproofing Conduit Membrane for Control Dial Orbital Systems Shower Head Hand Shower 4 1 3 2 5 1 Wallbox Uni Push RSK 188 25 12 pan head stainless steel screws x8 2 Conduit Clamp RSK 188 07 62 x2 3 PEX Hose ...

Page 12: ... Hose with Conduit 100 cm RSK 188 23 36 Kit Measurements NOTICE Use the two 45 degree Pipe Elbows included in the kit for the Drain Unit A 90 degree elbow will not be applicable 440 mm 932 mm Ø40 mm 184 mm 150 mm 192 mm 122 mm 201 mm 754 mm 726 mm 812 mm 690 mm Ø75 mm 126 mm cc 40 mm 853 mm 452 mm 538 mm 90 mm 150 mm 145 mm Page 12 of 33 ...

Page 13: ...Crucial Kit Measurements CAUTION Crucial measurements 600 mm 955 mm X Finished floor height where it is level Page 13 of 33 ...

Page 14: ...n Unit 150 mm 20 mm 170 mm X X 2 90 mm 442 mm X X Finished floor height where it is level 3 CAUTION It is crucial that all noggin pieces are in level and set according to recommended measurements to avoid misalignment in the shower installation 80 mm 45 mm 85 mm 85 mm 2100 mm 145 mm 45 mm X X Y X Finished floor height where it is level Y Wall thickness after completed installation Page 14 of 33 ...

Page 15: ... 33 5 mm 5 Valid for Orbital Systems Shower Head Hand Shower NOTICE It is optional which side of the shower the Diverter is placed Mirror slot in stud and wall covering if needed 1620 mm 145 mm 50 mm 145 mm 45 mm Install Drain 10 7 RSK 711 54 63 RSK 711 99 33 Page 15 of 33 ...

Page 16: ...ctive Cover until the Frame is being installed in a later step x7 Countersunk stainless steel screw All supplied screws x7 must be inserted 2 30mm X X Z Z X Finished floor height where it is level Z Drain Unit is centered in the shower area 3 Connect Drain Unit to the sewerage system as defined by local regulations Page 16 of 33 ...

Page 17: ...gs 2 Anchor the Pipes and Fittings according to local regulations Provided by Customer Anchors CAUTION Make sure to fasten and anchor the Pipes and Fittings so they cannot move or be separated Install Wall Brackets NOTICE Following steps only valid for Orbital Systems Shower Head and Hand Shower 4 1 RSK 188 23 36 RSK 187 79 99 5 Page 17 of 33 ...

Page 18: ...1 100mm 2 3 Page 18 of 33 ...

Page 19: ...4 1200 1300mm X 90mm 1000mm X 126mm X Finished floor height where it is level x3 Countersunk stainless steel screw Install Wallbox 1 Apply wall covering according to local regulations Page 19 of 33 ...

Page 20: ...2 1 RSK 831 41 66 3 4 600mm Page 20 of 33 ...

Page 21: ...based on methods for Plastic and Metal Pipe Systems For more information on how to perform leakage test see Branschregler for Säker Vatteninstallation The leakage test shall be documented 7 Next step depends on Shower Head variant Follow steps valid for Orbital Systems Shower Head Prepare Orbital Systems Shower Head 22 Follow steps valid for 3rd Party Shower Head Prepare 3rd Party Shower Head 22 P...

Page 22: ...hower Heads and Hand Showers applies to installation with Orbital Shower When using a 3rd Party Diverter Shower Head or Hand Shower it is recommended to choose products with low counter pressure in order to optimise the Orbital Shower performance Should the combined counter pressure from the Diverter and Shower Head Hand Shower exceed 1 bar at 10 L min it will affect the lifespan of the Filter Cap...

Page 23: ...he Conduit Ø 32 mm Ø 25 mm Ø 16 20 mm Ø 12 mm 3 4 Cut the Conduits CAUTION Cut the Conduits as close as possible to the Cones 50 mm 5 NOTICE Anchors provided by Customer 6 Secure Conduit in slot in stud and anchor with Conduit Clamp Page 23 of 33 ...

Page 24: ...d according to local regulations by a licensed electrician Prepare for Tiling 1 Raise the floor until it is level with the flange on the drain unit 2 Form a steep inclination according to local regulations min 2 inclination towards the Drain Unit Make sure that the lowest part of the inclination is in level towards the Drain unit surface Min 2 Page 24 of 33 ...

Page 25: ...egulations Apply Waterproofing Membrane For installations outside of Sweden The following chapter describes a general waterproofing membrane procedure for installing Orbital Shower in a wet room area Local rules and regulations for how to apply waterproofing membrane in wet room areas shall be applied Page 25 of 33 ...

Page 26: ...chönox Sopro Weber Zebra Apply Waterproofing Membrane 11 2 Provided by Customer 1 Waterproofing Conduit Membrane cc40 for Diverter 2 Waterproofing Conduit Membrane for Shower Head 3 Waterproofing Conduit Membrane for Control Dial Waterproofing membrane shall be applied around 2 penetrations in the wall and on the metal flanges of the Wallbox and the Drain Unit 1 Roughen the metal surface of the Dr...

Page 27: ...ck lacquered part of the Wallbox flange with tape 3 Apply waterproofing glue on the metal flanges of the Wallbox and Drain Unit 4 Spread the waterproofing glue with a fine toothed glue spreader or brush Page 27 of 33 ...

Page 28: ...oofing Membrane make sure to cover both the floor and the wall Firmly apply pressure and remove air pockets using a smoothing tool Make sure no blisters or creases occur 7 Apply liquid membrane on top of the Wallbox Waterproofing Membrane and to additional wall surface 8 Carefully mount Waterproofing Membrane and overlap by at least 50 mm Close the joints with liquid membrane Apply Waterproofing C...

Page 29: ...ake sure remaining surfaces are being waterproofed according to chosen waterproofing membrane manufacturer and local regulations Install Frame 8 Tiling 1 Apply tiles up against the lacquered line on all sides of the flange of the Wall Box 0 Page 29 of 33 ...

Page 30: ...ON Do not cut the PEX Hoses they need to stick out for coming installation steps Min 8 mm Max 16 mm Ø 30 mm 3 Make sure the tiles do not overlap the Grating allowing it to be removed NOTICE Floor tiles must be level with or higher than the Frame To achieve this the floor tiles must be at least 8 mm thick 4 2 mm 2 mm Page 30 of 33 ...

Page 31: ...ion without executing above mentioned steps Fixture Installation completed Next step is to install the Orbital Shower Core Control Dial Shower Head and Hand Shower including Diverter and Hand Shower Holder See Technology Installation Manual for details Page 31 of 33 ...

Page 32: ...This page is intentionally left blank Page 32 of 33 ...

Page 33: ...C E R T I F I E D S P A C E T E C H N O L O G Y ...

Reviews: