background image

GENERAL

These  luminaires  are  used  in  places 
where  emergency  luminaires  are  needed. 
Each  luminaire  must  be  permanently 
connected  to  mains  power  supply

.

  In 

normal  operation  the  led  strip  lights  and 
the  battery  is  charging.  In    case    of    a   
m a i n s     p o w e r     s u p p l y   f a i l u r e     t h e    
l u m i n a i r e     w i l l     l i g h t   t h e   l e d   s t r i p    
automatically  in  emergency  mode.    When 
the  mains  power  supply  is  restored the 
device turns to normal operation.  

OPERATION
Battery Charging

The  battery  charging  is  completely 
controlled  by  microprocessor  and  is 
protected  from  completely  discharge  and 
over  charge

.

Battery Cut-off

The  luminaire  enters  in  this  operation 
when  the  mains  power  supply  fails

 

and 

battery  has  lost  its  energy

During  this 

operation  the  luminaire  enters  the  idle 
state

 

and 

battery 

consumption 

is 

negligible,  in  order  to  be  protected  from 

deep discharge.

Manual

 Test

By  pressing  the  test  button  briefly  (less 
than  5  seconds)  an  emergency  operation 
test is performed. The white LEDs will be lit 
for  approx.  3  seconds,  the  red  LED  will 
flash during this test sequence. 

Automatic Operational Test

This  test  includes  all  the  operations  that 
provide  the  manual  test  and  is  conducted 
automatically every 15 days. In order to be 
performed, the mains power supply and the 
battery should be connected. 

Manual Autonomous Test

By  pressing  the  test  button  for  between  5 
and  10  seconds  a  battery  condition  test  is 
performed.  This  test  will  last  for 

the  stated 

duration

  and  can  only  be  performed  when 

the  battery  is  fully  charged  (steady  green 
LED). The white LEDs will be lit and the 

red

 

LED will flash during this test sequence. 

Automatic Autonomous Test

The Automatic Autonomous Test measures 

SELF TESTING MAINTAINED EMERGENCY LUMINAIRIES WITH LEDs

OPERATION TEMPERATURE RANGE
RELATIVE HUMIDITY
VIEWING DISTANCE

EXTERNAL DIMENSIONS (LxHxW) 

CONSTRUCTION MATERIALS 

TYPICAL WEIGHT

GUARANTEE 

OPERATION VOLTAGE

MAXIMUM POWER CONSUMPTION
BATTERY (Ni-MH)

 

 

CHARGING TIME

INDICATIONS 

CONTROLS

BATTERY PROTECTION

MINIMUM AUTONOMOUS DURATION

DEGREES OF COVER PROTECTION
PRODUCED IN ACCORDANCE WITH

LIGHT SOURCE INTENSITY (Mains/emerg.)

ILLUMINATION SOURCE

923064003_09_00

2

220-240V AC/50-60Hz

90 min

90 min

90 min

180 min

180 min

180 min

435 x 280 x 55 mm

673 x 400 x 55 mm

287 x 205 x 55 mm

4.8V/1.2Ah 4.8V/2.4Ah

4.8V/4Ah

4.8V/2Ah

4.8V/1.2Ah

7W/

7.4

VA (PF=0.94)

9.3

W/

9.8

VA (PF=0.94)

6W/6.

4

VA (PF=0.94)

230lm / 300lm  

26m

40m

64m

230lm / 123lm  

370lm / 300lm  

600lm / 500lm  

24 h

Charge LED, Lamp fault LED, Battery Fault LED

TEST button

From overcharge and deep discharge

  White LEDs

o

5 to 40  C

Up to 95% 

3 years

 (1 

year for the battery

)

Aluminum, ABS/PC, PC, Plexiglass

IP 44

EN 60598-1, EN 60598-2-22

, ΕΝ 55015, ΕΝ 61547, ΕΝ 61000-3-2, ΕΝ 61000-3-3

, EN 1838

1503gr.

1650gr.

2777gr.

1396gr.

876gr.

TECHNICAL CHARACTERISTICS 

(for

 LED MODULE Specs. see page 3)

LLB-26/90

LLB-26/180

LLB-40/180

LLB-64/180

LLB-40/90

LLB-64/90

Thank you for your trust in our products  

Olympia Electronics -  European manufacturer

Page 1 from

 

6

Summary of Contents for LLB-26/90

Page 1: ...est is performed This test will last for the stated duration and can only be performed when the battery is fully charged steady green LED The white LEDs will be lit and the red LED will flash during this test sequence Automatic Autonomous Test The Automatic Autonomous Test measures SELF TESTING MAINTAINED EMERGENCY LUMINAIRIES WITH LEDs OPERATION TEMPERATURE RANGE RELATIVE HUMIDITY VIEWING DISTANC...

Page 2: ... lamp replacement these must be replaced by parts of the same type by the manufacturer or by a competent person 4 In case of inactive use for a period greater than 2 months disconnect the battery by pulling out the battery s connector 5 I s not allowed to discard batteries t i into common trash bins they must be discarded only in battery recycling points Do not incinerate The light source containe...

Page 3: ...ire and use the two supplied mounting screws to install the aluminum bracket to the plastic bracket figure 2 Slide the luminaire to the aluminum bracket and use the bolt on the center to stabilize the luminaire figure 2 CEILING MOUNTING double sided Remove the aluminum bracket from the luminaire and install it with the included spacers screws and plugs in the ceiling page 3 Slide the luminaire to ...

Page 4: ...Figure 2 Side view Figure 1 GENERAL Measure the distance of the mounting holes and after the drilling place on these spots the mounting plugs and fasten the base with the mounting screws Figure 3 Front view Figure 4 Aluminum bracket Plastic bracket Page 4 from 6 1 2 SIDE WALL CLEARANCE Depending on the size of the luminaire the distance from the side wall must be more than LLB 26 440mm LLB 40 580m...

Page 5: ...INSTALLATION double side luminaire A 1136 SET OPTIONAL AFTER REQUEST INSTALLATION PICTOGRAMMS 1 Unfasten the two screws of the luminaire and remove the top part of the luminaire 2 Insert the pictogramm after removing the protective film from the back side 3 Carefully fit the top aluminium cover and reinstall the retaining screws 923064003_09_002 ...

Page 6: ...ectronics gr info olympia electronics gr Battery replacement process Maintained operation The luminaire lights its illumination source when it is powered by the mains power supply or not It can be done only by a competent person and after the mains interruption 1 Unfasten the two side cover screws and remove the plastic cap with the indications by sliding it gently to the right 2 Remove the old ba...

Reviews: