background image

NOVATEK-ELECTRO LTD

Intellectual Industrial Electronics

 

 

RNPP-302 

 

MULTIFUNCTIONAL 

THREE PHASE VOLTAGE MONITORING RELAY

 

 

 

OPERATING MANUAL 

                          
 
 

 

 
 
 
 
 
 
 
 

 

 
 
 
 

Quality control system on the production complies with requirements ISO 9001:2008 

 

 

Review the Operating manual before using the unit. 
Store the unit in the operating environment for 2 hours before switching to the mains. 
Do not use abrasives or organic compounds for cleaning (spirit, gasoline, solvents, etc.). 

NEVER ATTEMPT TO REMOVE AND REPAIR THE UNIT. 
Some of the unit components may be live. 
NEVER  ATTEMPT  TO  OPEN  AND  REPAIR  THE  PROTECTED  EQUIPMENT,  IF  SWITCHED 

TO THE UNIT SOCKET. 

Do not allow any water on the contacts of the connecting blocks or inner elements of the unit. 
Do not use the unit in corrosive environments with the air containing acids, alkalis, oils, etc. 

 

 

 
 
 
 

www.novatek-electro.com

 

Summary of Contents for RNPP-302

Page 1: ...for 2 hours before switching to the mains Do not use abrasives or organic compounds for cleaning spirit gasoline solvents etc NEVER ATTEMPT TO REMOVE AND REPAIR THE UNIT Some of the unit components m...

Page 2: ...MS of the phase voltage or alternatively line voltage depending on mode of operation Voltage fault in mains power supply and the type of the interruption State of output relay contacts OPEN CLOSE NOTI...

Page 3: ...phase to neutral voltage on each phase L1 L2 L3 if the parameter 0 or alternatively phase to phase voltage L1 L2 L2 L3 L3 L1 if parameter 1 Phase Indicator indicator of the currently measured phase L...

Page 4: ...esting of the RNPP 302 4 2 2 Minimal voltage monitoring mode 1 If the RNPP 302 was initially in turned OFF state then in case the correct voltage is applied to the device it will automatically turn ON...

Page 5: ...load after the time and turn OFF the signalization RNPP 302 performs the control over following parameters 1 Phase imbalance If the parameter 1 the RNPP 302 performs the control over phase imbalance...

Page 6: ...ignalization relay for the operation by the contactor also So the main output relay could be used as a signalization relay with normally closed contacts contacts are closed when there is no alarm situ...

Page 7: ...manual stop start function is required Voltage setting Voltage measurement 0 3 0 0 phase voltage phase to neutral 220V 1 phase voltage phase to neutral 230V 2 phase voltage phase to neutral 240V 3 lin...

Page 8: ...iance with the operating manual by the user within the warranty period RNPP 302 is not subject to the warranty service in the following cases expiry of the warranty period availability of mechanical d...

Page 9: ...220 240 LYQ20DC12 6031007G 6131406HQ 6 1393099 3 6 1393099 8 6 1393122 4 6 1393123 2 6 1393767 1 6 1393843 7 6 1415012 1 6 1419102 2 6 1423698 4 6 1608051 6 6 1608067 0 6 1616170 6 6 1616248 2 6 16162...

Reviews: