background image

Step 1 

Unpack your Sail

 

Begin by removing your North Sails Purchasers Pack including 
your Quality Control and Warranty information. Reserve for 
future reference. Locate and identify the battens (if any) and 
reserve for installation later.

Step 2 

Attach the Mainsail Tack

 

Begin by unrolling your mainsail on the side deck from luff to 
leech. Lift the mainsail tack area and attach to your tack fitting.

Your new Mast Furling mainsail incorporates a North Sails 
exclusive Rope Tack. This feature is designed to provide a soft and 
easily furled corner attachment. The sail has less patching the 
normal corner, but has the Spectra/Dyneema rope splayed and 
sewn into the sail to proved strength.

Please ensure the tack rope is connected to a smooth hook or 
shackle to ensure durability and that no chafing occurs.

NOTE: 

If your mainsail has a Crab Claw Cutaway and two 

webbing attachment points – Please read the Stowaway  
Mast Furling Mainsail installation guide.

www.northsails.com

Congratulations on purchasing your new North Mast Furling Mainsail. 
This guide is intended to help better understand the key construction 
elements, usage and installation of your sail. If you have any questions 
after reading this document and before installing your sail, please 
contact your North Sails representative.

It is best to have two people installing the sail which can be 
accomplished in less than one hour. Your boat needs facing directly 
into the wind and ideally the wind speed should be less than 8 knots.

  NORTH SAILS 

   MAST FURLING

INSTALLATION GUIDE 

Step 2

Отзывы: