background image

V4.2

REV. 05/2022

PERSA 400

EN

USER’S AND INSTALLER’S MANUAL

EN

Summary of Contents for PERSA 400

Page 1: ...V4 2 REV 05 2022 PERSA 400 EN USER S AND INSTALLER S MANUAL EN...

Page 2: ...g systems This marking on the product or literature indicates that the product and electronic accessories eg Charger USB cable electronic material controls etc should not be disposed of as other house...

Page 3: ...enced in terms of usage of the product in a safe manner and who understands the risks and dangers involved Children shouldn t play with the product or opening devices to avoid the motorized door or ga...

Page 4: ...l all safety conditions have been met In the event of tripping of circuits breakers of fuse failure locate the malfunction and solve it before resetting the circuit breaker or replacing the fuse If th...

Page 5: ...CHNICAL SPECIFICATIONS PERSA400 Power Supply 230V AC 230V 50 60Hz 110V AC 110V 50 60Hz 24V DC 24V Power 230 110V 300W 24V 80W Current 230V 1 3A 110V 2 5A 24V 3A Rotational speed 230 110V 1400 RPM 24V...

Page 6: ...ion B Vertical distance from the floor to the top of the front support Set dimension A this can be any size of your choice After you set dimension A subtract 56mm to find dimension B It is very import...

Page 7: ...the installation process it is required to respect the dimensions that are within the highlighted area ex y 170 x 140 During the installation process it is required to respect the dimensions that are...

Page 8: ...you should unlock the motor in order to be able to extend retract arm easily see page 5B to get the correct po sition for supports Place the dowels in each support with a small amount of lubricant so...

Page 9: ...the micro in that position 06 Take the gate to the open position 07 Loosen the screw shown in the image 24 so that it is possible to move the micro switch in the profile 08 Adjust the closure micro s...

Page 10: ...on cables It is important to use stoppers at the opening and closing of the gate If not res pected components of the automation may suffer efforts for which they were not prepared and as a result will...

Page 11: ...n a 24V PERSA automatism installation it is necessary to conduct tests with a direct connection to a external power supply battery 24V In the diagram below shows how to make this connection NOTES Once...

Page 12: ...otate one way and during the closing the motor will rotate the opposite way 04 Finally connect it to a 230V or 110V power plug depending on the motor control board in test If the motor works the probl...

Page 13: ...support dowels Check motor supports Make sure that supports remain well fixed on the pillars and gate to ensure proper functioning of the equipment These maintenance measures must be applied every yea...

Page 14: ...board Pull it out and send it to our MOTORLINE technical services for diagnosis 4 If the motors doesn t work remove them from installation site and send to our MOTORLINE technical services for diagnos...

Reviews: