background image

   

   

1   

   

   
   
   

SLIDE 500 

 

 

 

Operating and installation instructions 

 
 
 
 
 

Summary of Contents for Gateway Control SLIDE 500

Page 1: ...1 SLIDE 500 Operating and installation instructions...

Page 2: ...f the gate Safety devices should be checked on a monthly basis The gate motor should be kept clean at all times The mechanical parts of the gate motor conform to standards EN12604 and EN12605 It is th...

Page 3: ...E 500 is an electro mechanical sliding gate operator designed to automate domestic sliding gates up to a maximum 7 metres wide and up to 500Kg in weight The on board control panel is very versatile an...

Page 4: ...4 2 Technical Specifications...

Page 5: ...no unusual friction along the opening and closing The ground track or cantilever gear and foundation plate must be fully installed and set solid before installing the electric motor The gate must be i...

Page 6: ...5 Right Limit switch plate 11 Flashing warning light 6 Drive Rack Note Electric cabling should be run in suitable conduit or pipes Mains power supply 230V should be run separately to any low voltage c...

Page 7: ...09 and 10 below Ensure the mains power cable is in the centre where the foundation plate is to be mounted Bolt foundation plate to concrete or set in concrete making sure the power cable is fed up th...

Page 8: ...s correct with drive cog and intended position of drive rack 6 Secure motor into position Secure motor in position with fixing bolts as Fig 15 Make wiring connections for power supply motor connection...

Page 9: ...Slide motor is supplied with plastic casings that fit over the fixings bolts Check the manual release mechanism by inserting the manual release key into the key slot at the base of the motor Ensure th...

Page 10: ...Drive Rack in place so that the teeth sit neatly and centrally onto the Drive Cog of the Slide motor Manually move gate leaf open and closed to ensure that the gate still moves freely with no excessiv...

Page 11: ...ually Monthly Clean foliage or insects from gate or control box Monthly Check the force of the gate leaf when moving 6 Monthly Always consult a specialist if any problems occur which are not solved by...

Page 12: ...urers installation instructions at the site as stated below and accordingly is in conformity with the provisions of the Machinery Directive 89 392 CEE as amended by 91 263 CEE 92 31 CEE and 93 68 CEE...

Page 13: ...turers installation instructions at the site as stated below and accordingly is in conformity with the provisions of the Machinery Directive 89 392 CEE as amended by 91 263 CEE 92 31 CEE and 93 68 CEE...

Reviews: