background image

  
                                    Swallow Instruction Manual 

CEB00XXX-53-000 

 

Issue 2          30 January 2020 

 
 

 
 

LASERMET 

 

SWALLOW 4000 

 

INSTRUCTION MANUAL 

 
 

 

 
 

 

THE SWALLOW 

FILTERED FUME EXTRACTION SYSTEM FOR LASERS 

 

Issue 2 

 
 
 
 

Summary of Contents for SWALLOW 4000

Page 1: ...Swallow Instruction Manual CEB00XXX 53 000 Issue 2 30 January 2020 LASERMET SWALLOW 4000 INSTRUCTION MANUAL THE SWALLOW FILTERED FUME EXTRACTION SYSTEM FOR LASERS Issue 2 ...

Page 2: ...LOW 4000 Instruction Manual Contents 1 Safety Warnings 3 2 Concept 4 2 1 Main Components 4 2 2 System Description 5 3 Installation 6 3 1 Filter Installation 7 4 Wiring 8 4 1 Electrical Wiring Connections 9 5 Operation 10 5 1 Maintenance 10 6 Specifications 11 7 Warranty 11 8 Contact Details 12 ...

Page 3: ... to tamper with the parts open them or use them outside of the parameters contained herein The units are only designed to be fixed to surfaces using their inbuilt fixing holes They must not come into contact with each other or any other moving part when in use The parts should never be subject to impact or mechanical strain Safety switches should never be defeated or bypassed It is imperative that...

Page 4: ... on the laser process Lasermet provides a full range of laser interlock equipment including control systems interlock switches illuminated warning signs laser shutters door locks external power supplies etc which can be connected to provide a complete laser interlock system Full support design and installation is available from Lasermet please contact us for any queries Contact details are given a...

Page 5: ... of the unit and includes an integral filter holding frame that enables filters to be installed without using fasteners The unit accommodates a 2 inch or 4 inch prefilter The second stage accommodates a specific HVAC air filter The third stage includes a HEPA filter holding frame for the HEPA air filter The fan is positioned at the air exit side of the unit and has a rated capacity of up to 4000 c...

Page 6: ... a HEPA or absorbent filter s at the final stage The 4000 cfm 6800m3 hr rated unit has a fan that provides a uniform airflow at sustainable noise levels Adjustable directional louvers return the filtered air into the working space LED lights show when the unit is ON and the particulate air filter pressure drop and unit operation Power Supply Options and ordering data Power Supply Part No 120 VAC 1...

Page 7: ...Filters are installed in the inlet FastFrame holding frame Bag filters up to 30 depth are the primary filtration with the optional addition of a 2 or 4 prefilter in front of the primary filter if required Primary Filter Installation 1 Justify the filter s bottom edge to the back of the holding frame allowing the filter to rest on the compression tabs 2 While pressing down on the filter compress th...

Page 8: ...y filter Note minor prefilter frame deflection is expected 4 Wiring The system is completely factory wired to a junction box located on the top panel See system label attached to top of system beside the junction box and apply correct inlet power see wiring diagrams on following pages Follow local electrical codes for inlet power connection Once local power is energized the Swallow Fume Extraction...

Page 9: ...Swallow Instruction Manual CEB00XXX 53 000 Page 9 of 12 Issue 2 30 January 2020 4 1 Electrical Wiring Connections ...

Page 10: ... your system is in optimal operation 1 Filters The pressure drop across the filter exceeds the recommended change out pressure drop or system design pressure The recommended dirty or change out pressure drop will illuminate the red Change Filters light Disconnect power and refer to the filter installation 2 System The system should be periodically inspected and routine maintenance checks or other ...

Page 11: ...ss a number of samples and are not guaranteed Lasermet reserve the right to alter any specification without prior notice 7 Warranty Lasermet provide a 12 month warranty for defects in materials and manufacture from the date of installation or delivery Installations completed by Lasermet are covered against defects in workmanship for 12 months Damage or defects caused by other factors are not cover...

Page 12: ...rovide a complete system We also supply equipment and consultancy covering all aspects of laser safety Full support design and installation is available from Lasermet please contact us for any queries For sales and technical support Lasermet Ltd Lasermet House 137 Hankinson Road Bournemouth BH9 1HR United Kingdom Tel 44 0 1202 770740 Fax 44 0 1202 770730 Email sales lasermet com Website www laserm...

Reviews: