background image

Specialists in fireplace design and manufacture

SUPER NOVA INSERT RF

INSTALLATION & OPERATING INSTRUCTIONS

IMPORTANT:

INSTALLER, PLEASE LEAVE THESE INSTRUCTIONS WITH THE UNIT ON COMPLETION.

10 YEAR FIREBOX WARRANTY

The firebox is covered by a 10 year warranty. 

Other parts are covered by a one year limited warranty.

Head Office – 13 French Avenue, Brendale, Queensland 4500

Telephone – PH: (07) 3490 5500

Facsimile – FAX: (07) 3490 5520

Website: -

www.kemlan.com.au

Business hours: - Monday to Thursday 7:30am-4:00pm. Friday 7:30am-2:00pm

Email: -

[email protected]

03/07/2017

Ver.7

1

Summary of Contents for kemlan supernova rf insert

Page 1: ...PLETION 10 YEAR FIREBOX WARRANTY The firebox is covered by a 10 year warranty Other parts are covered by a one year limited warranty Head Office 13 French Avenue Brendale Queensland 4500 Telephone PH 07 3490 5500 Facsimile FAX 07 3490 5520 Website www kemlan com au Business hours Monday to Thursday 7 30am 4 00pm Friday 7 30am 2 00pm Email sales kemlan com au 03 07 2017 Ver 7 1 ...

Page 2: ...ON FASCIA A B I G C D Denotes measurement from standard and cast iron fascia measurement is also dependent on fascia position placement E H A B C D E F G H I STD C IRON STD C IRON MEASUREMENT 800 1000 645 420 470 327 377 660 605 305 820 F 03 07 2017 Ver 7 2 ...

Page 3: ... from the flue Any gap larger than 25mm should be shielded with non combustible material Masonry Metal and or insulating material Fans must be installed operational at all times when a timber mantle is installed Minimum Hearth Requirements Thickness to be a minimum of 9mm non combustible material and must extend 300mm in front of firebox door and 300mm to each side of the firebox door TECHNICAL SP...

Page 4: ...LLATION Ceiling INSTALLATION INSTRUCTION Triple skin flue system 10 8 and 6 6 Flue Stainless steel flue pipe All flue pipes must be connected with pop rivets supplied by installer Flue system to be installed to suit AS NZS 2918 2001 750 Rear of unit to Hebel Block 30mm min Hebel Block min thickness 75mm Rear timber stud wall combustible wall 9 25mm min clearance between 10 flue and framing 03 07 2...

Page 5: ...upright to be no closer than 150mm from the fuel loading door opening and extend into the room by no more than 100mm Fore hearth is 9mm thick and consisted of Bellis board and must extend a minimum of 200mm either side of the fuel loading door opening 03 07 2017 Ver 7 5 ...

Page 6: ...l 300 min Firebox to combustible material Improved heating efficiency is achieved by admitting cool air into the brick cavity where it is heated by the outer skin of the firebox and active flues then released back into the room via hot air outlet vents NOTE Top of brick chimney can be left open where no trees can cause a build up of leaves etc on top the weather plate Weep holes must be left at we...

Page 7: ...nted upstands Minimum 600mm below ceiling 6 Flue Bottom vent 240 x 90 Top vent 240 x 90 Directly below register plate 8 Flue 10 Flue Ceiling 300 300 min firebox to combustible material 300 Min firebox to combustible material 653 9 DETAIL A All 8 10 assembled flues must have the crimps pointing upwards crimped plain All 6 assembled flues must have the crimps pointing downwards crimped plain DETAIL ...

Page 8: ...e finish to full masonry chimney INSTALLATION INSTRUCTION S steel weather tray With upstand S steel Cowl Run a bead of silicone down the vertical seam of the outer casing to the weather tray 03 07 2017 Ver 7 8 ...

Page 9: ... COMPLY WITH AS NZS 2918 INCREASE FROM 1000 MIN UNTIL CLEAR WITHIN 3000 OF TOP OF FLUE 3000 ANY NEARBY STRUCTURE 3000 MORE THAN 3000 600 MIN 3000 1000 MIN IF CLEAR WITHIN 3000 OF TOP OF FLUE INCREASE AS NECESSARY UNTIL NOTHING WITHIN 3000 OF FLUE TOP 600 MIN 3000 OR LESS 03 07 2017 Ver 7 9 ...

Page 10: ...RING Don t touch the surface It will be soft and gummy during this paint curing phase Once cured it will not be soft again CURE WITH 3 FIRES Most stoves cure with 3 burns The first two 2 should be 250 F for 20 minutes or about half a normal fire Let the stove cool down between burns The last fire should be 500 F to 700 F for at least 45 minutes The point being cure slowly without a hot fire Stoves...

Page 11: ...03 07 2017 Ver 7 11 ...

Page 12: ...mately 10 to 15 minutes until the new pieces are burning well then it may be returned to its desired setting 6 To set the fire for overnight burn two thirds fill the firebox with hardwood and fully open the air inlet Once the fire is burning well the air inlet control should be shut down approximately three quarters of its travel Setting the air inlet control may be varied to suit your particular ...

Page 13: ... with higher heat production than wet or green wood The difference between the amount of heat produced by dry wood and green wood is so great that a dry softwood of good grade will produce more heat than green hardwood Green white ash for instance is not as good a fuel as dry tamarack The reason for the superiority of dry wood is easy to understand Heat cannot be produced until moisture has been d...

Page 14: ...heater or re installation of replacement heater 4 8 Failure to use fireplace components supplied by Kemlan Industries Pty Ltd 4 9 Cost of inspection for damaged heater 5 CLAIMS 5 1 I Kemlan will provide a full replacement of the heater in the first five years after installation ii Replacement in the subsequent five years i e sixth to tenth year after installation will be on the following basis Own...

Reviews: