1.

Power

The ION ARA DOCK4 bump test and calibration station has two power sources. A 12V DC 

mains power supply and an internal rechargeable battery.

The internal rechargeable battery provides approximately 5 hours of continuous 

operation when fully charged (based on 4 x ARA’s inserted).

The ION ARA DOCK4 will automatically switch itself off between tests if inactive for 

2 minutes. This can be adjusted via ION ARA Dock4Manager software.

The power LED is green when it has sufficient charge or connected to mains power.

Setup and Installation 

1. Loosen the lid cover bolts with a 3mm hexagonal wrench and open the lid to gain

access to the calibration gas compartment.

2. Insert the calibration gas into the housing and screw clockwise until seated.

Secure the cylinder with the bottle strap. Close the lid and fasten the cover bolts.

3. The calibration pressure gauge will indicate the amount of gas available.

4. Press the power button. The ION ARA DOCK4 bump test and calibration station is now

ready to use.

NOTE: These can be adjusted via ION ARA DOCK4 Manager and IR Link

 

Battery low 

        

Normal operation

No USB

Default Gas Concentrations

The recommended default calibration gas concentrations are below:

ION ARA Models:  

Gas Type:   

Gas Concentrations:

ARA100, ARA100H 

Hydrogen Sulfide (H2S) 

25 ppm

ARA200, ARA200H 

Carbon Monoxide (CO)  

100 ppm 

ARA300 

Oxygen 

(O2) 

18% 

Vol 

ARA400 

Sulfur Dioxide (SO2)   

10 ppm