This Assembly guide is designed to provide you with step by step instructions to ensure your system is
erected easily and safely using the 3T (Through the Trap) Safety Standard. Before assembly please read 
the safety notes carefully.

Span 500 is a mobile access tower system  complying with EN 1004 and WAHR, with vertical ladder access, designed for Class 2 loading.

Safe Working Loads and Working Heights
(WAHR)

The safe working load at each level of platform is 275

Kg evenly distributed, regardless of whether one or

two platforms are installed. Therefore, even if two

platforms are installed side by side, total cumulative

load shall not exceed 275Kg distributed.

The total loading on the tower structure should not

exceed 720kg. Normal maximum platform height for

indoor use is 12m for Double Width, and 8m for

Single Width. For outdoor use, the maximum height is

8m for Single and Double Widths.

3T Safety Standard - THROUGH THE TRAP

This is an approved method of tower construction

which, if carried out by a competent person,

complies with all current safety legislation.

Construction - basic principles

•  Always install the trapdoor platform over the 

ladder (if one is fitted).

•  Ensure the trapdoor hinges to the 

OUTSIDE

of 

the tower (not the centre).

•  Once the platform has been installed, climb, using

the approved method and 

SIT IN THE 

TRAPDOOR OPENING.

•  While seated, attach horizontal braces to the 

frames to form guardrails on 

BOTH SIDES OF 

THE PLATFORM.

•  See assembly instructions for specific placement 

of guardrails.

•  2 braces are normally required each side - 

although bracing frames can be used on the 

outside if desired or specified in the instructions.

•  Only when the platform is fully guarded is it safe 

to stand up.

Dismantling

•  Unlock the brace ends furthest away from the 

trapdoor.

• 

DO NOT REMOVE BRACES UNTIL SITTING IN

THE TRAPDOOR.

ASSEMBLY PROCESS

1. Preparation

Locate the tower level adjusters on each leg at 10cm (4ins) from the bottom of the leg.

Unlock the interlock clips on all frames. When installed, always move the interlock 

clip to the "locked" position.

Sort the braces into horizontal and diagonal braces - the diagonals are slightly longer. 

Unlock the brace locks.

2. Base

Push the four leg assemblies into a pair of 2-rung (1m) or 4-rung (2m) frames.

Follow the erection procedures as shown (Section 4). It is important to follow the

bracing pattern precisely. The tower shown in the build procedure is a double

width tower.  For Single Width Towers, see notes section.

Note the locking and unlocking position for the castors as shown here.

3. Locking down the platform

A windlock clip is installed on the platform at the hook. This is locked as shown here.

Base

The choice of base frame for your SPAN 500 tower depends on the platform height required: See table 1 below:

Unlocked

Locked

Unlocked

Locked

Unlocked

Locked

4m Platform Height Tower
Assembly

1.

Toeboard Set

2.

Diagonal Brace

3.

2m Standard Frame

4.

Horizontal Brace

5.

Stabiliser

6.

1m Standard Frame

7.

Adjustable Leg

8.

Castor

9.

1m Ladder Frame

10.

2m Ladder Frame

11.

Fixed and Trapdoor Platform

3m Platform Height Tower
Assembly

1.

Toeboard Set

2.

Diagonal Brace

3.

Stabiliser

4.

2m Standard Frame

5.

Adjustable Leg

6.

Castor

7.

Horizontal Brace

8.

2m Ladder Frame

9.

Fixed and Trapdoor Platform

ASSEMBLY COMPONENTS

4. BUILD PROCESS

To Dismantle, follow the build process but in reverse order noting the
following.

• To remove the guardrail frames or braces, first unlock the hook at the 

end away from the trapdoor. 

•  Sitting through the trapdoor, unlock the near end hook and remove 

the brace.

To Move the tower to a new position, first prepare the tower.

• Wind speed should not exceed 29 km/hr (force 4).
•  Release the castor brakes.
•  Raise the stabiliser feet only enough to clear obstructions.
•  Ensure tower is empty (material and personnel). Move the tower 

manually by applying force at the base - do not use machinery to push
or pull the tower. Once moved - prepare the tower for use.

•  Check all castors and stabilisers are in firm contact with the ground.
•  Check tower is vertical (spirit level) and adjust legs as required.
•  Reapply the castor brakes.

Insert castors and
adjustable legs into the
base frame (see table 1
on selecting the base
frame). Position the
ladder frame as shown
and clip one horizontal
brace onto the vertical
member just above the
1

st 

rung, with claw

facing outwards. Clip the
2

nd

horizontal brace

onto the cross tube
(rung) on the opposite
side facing down.

Insert one 4 rung
standard frame and one
4 rung ladder frame into
the base frames and
lock. Clip diagonal
braces in opposing
directions from the 1

st

to

3

rd 

to 5

th 

rungs. Check

base unit with a spirit
level in both vertical and
horizontal directions.

Fit stabiliser to tower -
see separate section on
stabilisers. Add a fixed
platform to 1

st

rung in

front of the ladder.

Fit trapdoor platform to
4

th

rung of tower in front

of the ladder. Ensure
trapdoor opens
outwards.

Using the 3T method,
position yourself in the
hatch and attach
horizontal braces to the
5th and 6th rung on both
sides of the platform. Do
not stand on the
platform until it is fully
guarded.

Attach the next set of
frames and lock.
Continue diagonal
bracing in a zig-zag
pattern as shown.

Install next platform at 4
rungs above the last
one. Use the 3T method,
install 2 braces on both
sides of platform before
climbing onto platform.
Continue with steps 6
and 7 until working
platform height is
reached.

Once working height is
reached, move fixed
platform from 1

st

rung to

working level, opposite
to ladder. Fit trapdoor
platform at ladder. Guard
with horizonal braces
using the 3T method.

Once guarded, climb
onto the platform and fit
toeboard set to
complete the tower
build.

DISMANTLING / MOVING TOWERS

1

2

3

4

5

9

8

7

6

Assembly Guide

Span

500

ACCESS TOWER SYSTEM

Platform height (m)

Base Frame    Parts required

2, 4, 6, 8, 10, 12

1m (2 rung)      One frame and one ladder frame

3, 5, 7, 9, 11

2m (4 rung)      One frame and one ladder frame

Table 1

REMEMBER - NEVER STAND ON

AN UNGUARDED PLATFORM

Unlocked

Locked

EN1004-3-8/12-XXCD