background image

 

Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany 

[email protected]

 • www.huck.net

 

 

\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4687_30-01-en-003.doc 

0

 

 

Installation Instructions 

Mini Pirate Tower 

 Art. 4687-30 

(set in concrete)

 

 

 

 

 

Summary of Contents for 4687-30

Page 1: ...Berghausen Germany seiltechnik huck net www huck net Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4687_30 01 en 003 doc 0 Installation Instructions Mini Pirate Tower Art 4687 30 set in concrete ...

Page 2: ...erver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4687_30 01 en 003 doc 0 Revision history Revision 0 2006 22 06 The first allowed version Assembly instruction Revision 3 2012 08 15 alle Netze fixieren FH All rights rewerved Copyright 2006 Huck Seiltechnik GmbH ...

Page 3: ...687 30 0 3 Delivery contents parts list with part numbers 0 4 Erection instructions 0 5 Post installation checks 25 B Maintenance instructions Mini Pirate tower Art 4687 30 to set into concrete 25 6 Introduction Maintenance 25 7 General maintenance information 25 8 Specific maintenance advice 25 9 Maintenance timetable 25 10 Monthly maintenance 25 11 Quarterly maintenance 25 12 Annual maintenance ...

Page 4: ...directly from your supplier Please do not hesitate to call us on 01308 425100 if you have any problems during installation or with any other questions Following installation complete assembly instructions maintenance instructions and a maintenance record must be sent to the operator who must confirm receipt in writing See the last page of this document All nuts and bolts are hot dip galvanised or ...

Page 5: ...0 m ø 139 7 mm length including post footing 4 Name and weight of the heaviest component 1 steel post 1 peace approx 100 kg 5 Intended age group 3 years and over 6 Attention Equipment to be embedded in concrete Concrete C25 30 Required concrete 1 20 m3 Foundations area to be excavated 1 x 1 00 m long x 1 00 m wide x 0 70 m high total depth 1 10 m including 10 cm drainage 3 x 0 70 m long x 0 35 m w...

Page 6: ...Coated plywood disc Ø 1000 mm x 23 thick 6 1 Top plate Ø 335 mm x 12 thick galvanised 7 6 Tube clamps with carriage bolt and stop nut 40 Torx screw 4 5 x 25 100 12 Ring nut with threaded pole approx 250 mm and hexagonal nut premounted M12 galvanised 101 4 Hexagonal screw M12 x 30 galvanised 102 10 Tooth washer for M12 galv 103 6 Bolt with key M12 VA 104 6 Blue and yellow cap for M12 105 6 Washer Ø...

Page 7: ...tructions 2012 2013 4687_30 01 en 003 doc 0 Pos Quantity Element Description Size O K Missing 116 2 Loctite 117 1 Threaded rod M12 x 200 galv 118 2 Hexagonal nut M12 DIN 934 galv 1 Assembly instructions 1 Company sticker 1 Drainage tube to be provided by customer approx Ø 250 x L 700 10 1 Brush At customer s request 11 2 Tin of paint At customer s request ...

Page 8: ... text PLAY Play Installation Instructions Installation Instructions 2012 2013 4687_30 01 en 003 doc 0 3 2 In symbols Table 3 2 Delivery contents in symbols Pos Quantity Symbol 1 1 Ø 159 mm L 4 7 m 2 6 Ø 101 6 mm x 2 9 mm x 1500 mm 3 1 4 1 5 1 Ø 1000 mm x 23 thick 6 1 Ø 335 mm x 12 thick galvanised ...

Page 9: ... text PLAY Play Installation Instructions Installation Instructions 2012 2013 4687_30 01 en 003 doc 0 Pos Quantity Symbol 7 6 40 100 12 M12 galvanised 101 4 M12 102 4 for M12 galv 103 6 M12 VA 104 6 for M12 105 6 Ø 13 0 galv DIN 125 106 6 M12 VA DIN 985 107 6 M10 x 20 galvanised 108 1 M16 x 165 VA ...

Page 10: ...Y Play Installation Instructions Installation Instructions 2012 2013 4687_30 01 en 003 doc 0 Pos Quantity Symbol 109 1 M16 DIN 934 galv 110 1 Ø 350 mm x 140 high 111 1 Ø 17 0 DIN 9021 galv 112 1 M16 VA DIN 985 113 1 for M16 114 6 115 18 3 5 x 20 galv 116 2 Loctite 117 1 M12 x 200 galv 118 2 M12 DIN 934 galv ...

Page 11: ...echnik GmbH 35614 Aßlar Berghausen Germany seiltechnik huck net www huck net Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4687_30 01 en 003 doc 0 4 Erection instructions ...

Page 12: ...Huck Seiltechnik GmbH 35614 Aßlar Berghausen Germany seiltechnik huck net www huck net Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4687_30 01 en 003 doc 0 ...

Page 13: ...Huck Seiltechnik GmbH 35614 Aßlar Berghausen Germany seiltechnik huck net www huck net Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4687_30 01 en 003 doc 0 ...

Page 14: ...Huck Seiltechnik GmbH 35614 Aßlar Berghausen Germany seiltechnik huck net www huck net Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4687_30 01 en 003 doc 0 ...

Page 15: ...Huck Seiltechnik GmbH 35614 Aßlar Berghausen Germany seiltechnik huck net www huck net Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4687_30 01 en 003 doc 0 ...

Page 16: ...Huck Seiltechnik GmbH 35614 Aßlar Berghausen Germany seiltechnik huck net www huck net Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4687_30 01 en 003 doc 0 ...

Page 17: ...Huck Seiltechnik GmbH 35614 Aßlar Berghausen Germany seiltechnik huck net www huck net Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4687_30 01 en 003 doc 0 ...

Page 18: ...Huck Seiltechnik GmbH 35614 Aßlar Berghausen Germany seiltechnik huck net www huck net Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4687_30 01 en 003 doc 0 ...

Page 19: ...Huck Seiltechnik GmbH 35614 Aßlar Berghausen Germany seiltechnik huck net www huck net Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4687_30 01 en 003 doc 0 ...

Page 20: ...Huck Seiltechnik GmbH 35614 Aßlar Berghausen Germany seiltechnik huck net www huck net Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4687_30 01 en 003 doc 0 ...

Page 21: ...Huck Seiltechnik GmbH 35614 Aßlar Berghausen Germany seiltechnik huck net www huck net Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4687_30 01 en 003 doc 0 ...

Page 22: ...Huck Seiltechnik GmbH 35614 Aßlar Berghausen Germany seiltechnik huck net www huck net Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4687_30 01 en 003 doc 0 ...

Page 23: ...Huck Seiltechnik GmbH 35614 Aßlar Berghausen Germany seiltechnik huck net www huck net Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4687_30 01 en 003 doc 0 ...

Page 24: ...F Fall protection FR Foundation radius at least 10 cm G Drainage layer GN 3 Lashed net part pos 3 KNR Drainage tube at site to be provided by customer H Ø drill diameter LRB Intermediate space between duct and steel pole to be filled in with concrete MF Middle foundation MKe Insert steel pole into duct and position vertically ML Pole length above play height mo Assemble O K Top surface of playing ...

Page 25: ...installed safely in the following cases Safe equipment installation is not complete The protective surface has not been installed yet Appropriate maintenance work cannot guarantee operational safety 5 3 Removal of all assembly aids Please make sure that all assembly aids have been removed from the playing area The equipment must not be approved for use until this check has been made 5 4 Informatio...

Page 26: ......

Page 27: ...erghausen Germany seiltechnik huck net www huck net Fileserver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4687_30 01 en 003 doc 0 A Maintenance instructions Mini Pirate tower Art 4687 30 set in concrete ...

Page 28: ...rver text PLAY Play Installation Instructions Installation Instructions 2012 2013 4687_30 01 en 003 doc Revision history Revision 0 2006 22 06 The first allowed version Maiantanance instruction Revision 3 2012 08 15 alle Netze fixieren FH All rights reserved Copyright 2006 Huck Seiltechnik GmbH ...

Page 29: ...ce with EN 1176 7 guidelines Please note Providing any necessary repairs are carried out a piece of play equipment that is inspected regularly cannot become so damaged that it is dangerous Any spare parts which may be required can be obtained directly from your supplier This equipment should only be assembled maintained and repaired by persons with the necessary expertise A copy of the inspection ...

Page 30: ... that uncontrolled cold welding may occur when the nuts are tightened To prevent this it is necessary to spray the nuts and bolts with Teflon spray or another similar lubricant 7 4 Spare parts All spare parts must conform to the manufacturer s specifications 7 5 Identifying spare parts All spare parts are listed in the parts list The parts list follows the installation requirements 7 6 Special ins...

Page 31: ...tightened and checks carried out to ensure that there are no missing screws e g look out for holes you can see through 7 12 Preventing equipment use Use of the equipment should be prevented in the event of incomplete installation disassembly maintenance repairs and faults 7 13 Claims liability for faults Steel posts and footings are guaranteed if regular maintenance is carried out and recorded in ...

Page 32: ...n of the equipment 9 1 2 Maintenance intervals in the event of intensive use Please note that more frequent inspections and or maintenance are required if the play equipment is subject to intensive use 9 1 3 Faults that compromise safety In the event of a fault that compromises safety quick action must be taken This may involve repairing it immediately or shutting down and dismantling the equipmen...

Page 33: ... as chains ropes nets etc for damage and replace if necessary Check rubber parts sleeves etc for wear and tear or damage and replace if necessary If necessary remove excess padding maaaterial from the post footings due to danger of rotting Check the surface of wooden parts for damage caused by the weather or external influences and mould Repair or replace if necessary Check the surface of plastic ...

Page 34: ...ed for decay and corrosion It may be necessary to dig out or excavate certain components in order to do so Zinc paint should be applied to corroded areas and scratches Ascertaining whether there are any changes in equipment safety as a result of repairs that have been carried out or components that have been added or replaced The equipment must be inspected by someone with the necessary expertise ...

Page 35: ...intout Name of item Mini Pirate Tower ________________ Art No 4687 30 _____________________________________ Location ________________________________________________________________________________________ Customer or operator ______________________________________________________________________________ Town Town council Kindergarten Date of inspection Inspector O K Accessible Barriered Defects R...

Page 36: ......

Page 37: ..._________________________ Competent person in charge ___________________________________________________________________ ___________________________________________________________________ Installation company address ___________________________________________________________________ ___________________________________________________________________ Responsible assistant assembler ______________...