background image

STEAM GENERATOR

Hidro-SS Series

USER MANUAL

Summary of Contents for Hidro-SS Series

Page 1: ...STEAM GENERATOR Hidro SS Series USER MANUAL ...

Page 2: ...HIPMENT AND HANDLING WARNING Only qualified personnel should install and maintain this equipment Unauthorized alteration or improper maintenance of this unit may release the manufacturer from any warranty claims The installation must be in accordance with the instructions in this manual and applicable local plumbing and electrical codes ...

Page 3: ...m during operation Stay at least 30cm away from the hot steam escaping head It is recommended that one should not use the generator continuously for a long time because A The building materials may get damaged under an overheated environment B Overheating will present a scald hazard Must be careful while entering the steam bathroom If the steam room is overheated the bather shall get out of the ro...

Page 4: ...80V 3 12 2 5 4 220V 1 40 9 3 10 220V 3 23 6 4 10 380V 3 13 8 5 4 220V 1 54 5 3 10 220V 3 31 5 4 10 380V 3 18 2 5 6 220V 1 68 2 3 16 220V 3 39 4 4 16 380V 3 22 8 5 6 220V 1 81 8 3 16 220V 3 47 2 4 16 380V 3 37 3 5 6 Controller Specifications Model HD135T Hidro SS90 9 11 530 230 470 Hidro SS120 12 13 Hidro SS150 15 16 Hidro SS180 18 20 Hidro SS45 4 5 4 500 230 400 Hidro SS60 6 6 Hidro SS80 8 9 Hidro...

Page 5: ...ttic shelf or basement And it must be locked without movement Please See Figure1 B This series steam generator can be installed on the wall or on the floor but the unit must be level precisely There are two mounting holes on the back of the generator the screws must set in with strong expansion bolts or equivalent supports C The steam pipe should enter into the steam room and total length less tha...

Page 6: ...icone caulk to prevent the leakage A If the generator is mounted in a place where is difficult to access the water supply shut off valve should be located where it can be quickly accessed in emergency B The max pressure of magnetic valve is 2Pa the higher pressure will damage the valve Need to install a decompress valve or turn down the water inlet valve to prevent the damage C Do not use a saddle...

Page 7: ...sed by customers A The controller should be installed outside of the steam room with convenience access for operations Please install it as near as possible to the room s door The recommended height is 1 5meter above from the ground See Figure 3 B Dig a hole in the wall with size 40x80mm before installation The wires should be inserted and connected with the controller Hang the controller on the w...

Page 8: ...he light the function light beside is on too C TEMP Temperature setting press the TEMP key to temperature setting mode then press or to indicate your desired temperature 35 and 55 95 131 can be adjusted D TIME Working time settings press the TIME key to the TIME set mode then press or to indicate your desired time 1 12 hours can be adjusted E If the steam room temperature is higher than the desire...

Page 9: ...r outlet rinse valve B Connect the Actuator cable with that on steamer A Set the control mold at AUTO position when the machine stop working for 15mins the mainboard sends signal to open the drainer and after 3mins water inlet valve opens and let the water flush 1min to wipe out scale Then the water inlet valve and drainer valve close B If set the control mold to MAN then need to drain the water b...

Page 10: ...ric acid into the steam tank through a funnel as figure 5 showed 4 Set up the ball valve and turn it off then put the steam on a flat ground for motionless for 20 minutes As figure 6 5 After 20 minutes turn on the ball valve and let the citric acid flowing out 6 Open the water supply valve 7 Connect the electricity power 8 Rinse for 5 minutes 9 Switch off the electricity power shut off the water s...

Page 11: ...f circuit protector 2 The steam generator fails to function 2 Call our maintenance service center 2 Check if the circle protector is on the ON position 3 The steam generator fails to function 3 Check if the power is on and the water supply valve is open 4 Rinse valve hasn t been shut off 4 Check if the rinse valve of generator is closed Close the circuit protector and call our maintenance service ...

Page 12: ...ator Live wire 1 Live wire 2 220 240V 1ph Max 9kW Steam 4 5 9kW 220 240V 1ph 2x110V 1ph 2x110V 1ph Max 9kW Live wire 1 Live wire 2 220 240V 1ph 2x110V 1ph Steam 12 18kW 220 240V 1ph 2x110V 1ph L1 L2 L3 N N Steam Generator L1 L2 L3 N N ...

Page 13: ...Steam 4 5 18kW 220 240V 3ph Steam 4 5 18kW 380 400V 3ph 380 400V 3ph ...

Page 14: ...source and phase electricity 220V 380V a single phase electricity or three phases electricity Lower voltage causes less steam 6 When installing the steam generator we recommend using a larger size cable than normally used For comfort and leisure to choose a correct steam generator is same important as to design the steam room C Announcement The above messages are recommendations only These recomme...

Page 15: ...ch kind of design reduces the space of the steam bathroom 4 Easy cleaning and drainage must be taken into consideration when designing the floor drainage For the consideration of safety the floor must be slipping proof 5 The heights of steam bathroom must be limited to 2 4m or below Heights over 2 4m will cause a high or adequate temperature around the ceiling while the temperature around the floo...

Reviews: