background image

GODIAG GT107 Gearbox Data Adapter 

ECU IMMO Kit 

 

for PCMFlash PCMTuner KESSV2 for DQ200 DQ250 VL381 VL300 DQ500 DL501 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 

User's Manual v2.0 

 
 
 
 

 

Summary of Contents for GT105

Page 1: ...GODIAG GT107 Gearbox Data Adapter ECU IMMO Kit for PCMFlash PCMTuner KESSV2 for DQ200 DQ250 VL381 VL300 DQ500 DL501 User s Manual v2 0 ...

Page 2: ...be sure to use a stable and reliable power supply 12V 4A 5A Note Insufficient power supply can cause ECU damage or data loss 2 If the car battery is connected as the power supply it must be ensured that the voltage is at 12V and there is enough power in the vehicle battery to support power for at least 30 minutes It is recommended that you can start the car first and then connect the device Note I...

Page 3: ...WR CK DQ250E F 02E WR CK DQ200MQB G2 0CW WR CK DQ250MQB 0D9 WR CK VL300 V30 01J 0AN WR CK VL381 0AW WR CK DL501 G2 0B5 WR CK DQ500 0BH 0BT RD WR CK reading when using a direct connection DQ200 MQB G2 Boot MICRO RD WR CK DQ200 MQB G2 Boot EEPROM RD WR DQ250E F MQB Boot MICRO RD WR CK DQ250E F MQB Boot EEPROM RD WR VL300 V30 BSL FLASH RD WR CK VL300 V30 BSL EEPROM RD WR CK VL381 Boot MICRO RD WR CK ...

Page 4: ...Tuner J2534passthru 5 Perform data reading and writing operations Direct Car Connection Diagram Steps 1 Connect Godiag GT107 to the gearbox ECU VAG DQ250 DQ200 VL381 VL300 DQ500 DL501 for Renault DC0 DC4 Gen2 and Honda LUK UDCT 2 Connect the Godiag ECU IMMO Prog AD and connect the 12V vehicle battery The Godiag ECU IMMO Prog AD s IMMO button must be up 3 The Godiag GT107 analog ignition switch is ...

Page 5: ...Gearbox ECU interface connection definition ...

Page 6: ...KESSV2 DQ200 DQ250 DQ500 Connection Diagram ...

Page 7: ...ware to read and write data Work BOOT use a direct connection to the connector of the control UNIT the switching power supply is carried out either manually recommended or by using the scheme of automatic power control GODIAG GT107 DSG gearbox data adapter same PowerBox or converted from KESS In case of manual control the entrance to the boot mode may not happen on the first attempt Read DQ500 onl...

Page 8: ...he probe is connected to the GODIAG GT107 DSG Gearbox Data Adapter BOOT 1k ohm GND line included in the GT107 host It is mandatory to connect to line and it is highly recommended to use auto power to quickly feel the pin on the board The photos below show the drilling location and the point on the board where the probe should go ...

Page 9: ...ECU Disassembly connection pin diagram Package Includes 1pc x Godiag ECU IMMO Prog AD 1pc x DSG Adapter 1pc x Power Cord with Battery Clip 1pc x Probe ...

Page 10: ...Shenzhen Sinoy Technology Co Ltd All rights reserved www godiag com 86 18813687743 Sales GoDiag com Thanks for reading ...

Reviews: