Page 2: ...according to DIN EN ISO 9001 2000 To ensure a consistently high quality standard and user friendliness this documentation was created to meet the regulations of a quality management system which complies with the requirements of the standard DIN EN ISO 9001 2000 cognitas Gesellschaft für Technik Dokumentation mbH www cognitas de Copyright and Trademarks Copyright 2006 Fujitsu Siemens Computers Gmb...

Page 3: ...Opening the server 19 5 Main Memory 21 5 1 Population rules 21 5 2 Upgrading replacing main memory 23 6 Processors 25 6 1 Installing a second processor 25 6 2 Exchanging the processor 29 6 3 Exchanging the heat sink 32 7 CD DVD Drive 33 8 Controllers in Non Hot Plug PCI Slots 37 8 1 Installing controllers 39 9 Completion 41 9 1 Closing the server 41 9 2 Installing the server in the rack 42 Abbrevi...

Page 4: ......

Page 5: ...ternet You can go to the PRIMERGY Server documentation by clicking on industry standard servers Concept and target groups This Options Guide shows you how you can expand and upgrade the server V Caution The activities described in this manual may only be performed by specialist personnel with technical training I How to install remove the hot plug components is described in the Operating Manual fo...

Page 6: ...e ServerBooks CD supplied The Adaptec HostRAID User s Guide PDF available on the ServerBooks CD supplied The Service Supplement for PRIMERGY RX200 S3 PDF available on the ServerBooks CD supplied I You can order a supplementary ServerBooks CD by sending an e mail to the following address quoting your server data Reklamat PC LOG fujitsu siemens com Further sources of information Technical Manual on ...

Page 7: ...dules For further details see chapter Main Memory on page 21 CD DVD drive option The PRIMERGY RX200 S3 Server is equipped with a slimline bay intended for a CD DVD drive 5 25 x 0 5 inch For further details see chapter CD DVD Drive on page 33 Additional controllers in non hot plug PCI slots The system board has one PCI X and one PCIe x8 slot Because of the server s installation height these can onl...

Page 8: ...ase refer to the operating manual 1 3 Notational conventions The following notational conventions are used in this manual Italics indicate commands menu items or software programs Quotation marks indicate names of chapters and terms that should be emphasized Ê text which follows this symbol describes activities that must be performed in the order shown V CAUTION pay particular attention to text ma...

Page 9: ...ty Instructions on page 11ff Ê Make sure that all required manuals see Additional documentation about the server on page 5 are available printing out the PDF files if necessary You will definitely need the Operating Manual for the server and the Service Supplement for the server the Technical Manual for the system board Ê Shut down the server correctly switch it off pull out the power plug and ope...

Page 10: ......

Page 11: ...s manual and any unautho rized openings and improper repairs could expose the user to risks e g electric shock fire hazards and could also damage the equipment Please note that any unauthorized opening of the device will result in the invalidation of the warranty and exclusion from all liability Before setting up V CAUTION During installation and before operating the device observe the instruction...

Page 12: ...ect it from the mains voltage you must remove the power plug from the power outlet Always connect the device and the attached peripherals to the same power circuit Otherwise you run the risk of losing data if for example a power outage occurs and the central processing unit is still running but the peripheral device e g a storage subsystem has failed Data cables must be adequately shielded to avoi...

Page 13: ...ce suppression Install only system extensions that satisfy the requirements and rules governing safety electromagnetic compatibility and telecommunica tions terminal equipment If you install other extensions you may damage the system or violate these safety regulations Information on which system extensions are suitable can be obtained from the customer service centre or your sales outlet The comp...

Page 14: ...with a symbol a crossed out garbage can The marking also contains the chemical symbol of the heavy metal that determines the classification as a pollutant Cd Cadmium Hg Mercury Pb Lead Notes on handling CDs in CD ROM DVD drives V CAUTION Use only CDs in proper condition in the CD ROM DVD drive of your server to prevent data loss damage to the device or injuries Therefore check each CD for damage c...

Page 15: ... 1993 LASER CLASS 1 Modules with electrostatic sensitive devices Electrostatic sensitive components are identified by the following sticker Figure 1 ESD label V CAUTION When you handle components fitted with ESDs you must observe the following points under all circumstances Remove the power plug from the power socket before inserting or removing components containing ESDs You must always discharge...

Page 16: ... at the points marked green touch points Do not touch any exposed pins or conductors on a component Place all components on a static free base I You will find a detailed description of handling ESD components in the relevant European or international standards EN 61340 5 1 ANSI ESD S20 20 ...

Page 17: ...he server Ê Exit all applications and shut down the server correctly Ê If your operating system has not switched off the sever press the on off switch Ê Unplug the power plugs Figure 2 Pulling the server out of the rack Ê Loosen the knurled screws 1 and pull the server carefully out of the rack 2 as far as possible COMPAC T High Speed COMPAC T High Speed 1 1 2 ...

Page 18: ...or the server in the rack Before you remove the server from the rack you must therefore unplug all cables connected to the server from their sockets V CAUTION At least two people are needed to lift the server out of the rack Figure 3 Removing the server from the rack Ê Press the safety springs 1 on both sides and carefully pull the server forward a little 2 Ê Pull the server off the rails and plac...

Page 19: ...eparation Opening the server 4 2 Opening the server Figure 4 Removing the top cover Ê For removing the top cover press the cover button downward 1 Ê Slide the cover approx 1 cm towards the rear of the server and lift it off 2 1 2 ...

Page 20: ......

Page 21: ...uffered DIMM memory modules ECC with memory scrubbing and with the Single Device Data Correction SDDC Chipkill function is standard 5 1 Population rules Figure 5 Structure of the main memory in memory banks and memory modules The memory modules have to be based on x4 or x8 organised FBD533 PC2 4200F or FBD667 PC2 5300F fully buffered DIMM modules and must be populated in pairs You must only use me...

Page 22: ...ped Memory mirroring Either 4 or 4 4 identical memory modules are required for memory mirroring Bank 1 module pair 1A 1B Bank 2 module pair 1C 1D Bank 3 module pair 2A 2B Bank 4 module pair 2C 2D Equipped Empty Empty Empty Equipped Equipped Empty Empty Equipped Equipped Equipped Empty Equipped Equipped Equipped Equipped Memory bank 1 2 3 4 Channel module 1A 1B 1C 1D 2A 2B 2C 2D Equipment 4 identic...

Page 23: ...on page 17f Ê In order to make the slots lateral ejector tabs more readily accessible lift the air duct above the processors up and off Figure 6 Removing a memory module Ê Flip the ejector tabs on each side of the slot outward 1 This levers an installed memory module out of its slot Ê If the slot was already occupied Remove the memory module from the slot 2 1 1 2 ...

Page 24: ...odule into the slot 1 until the ejector tabs on both sides of it engage 2 Ê Reinstall the air duct Ensure that the hooks on the air duct see figure 8 engage on the fan s rear panel Figure 8 Hooks of the air duct Ê Close the server plug in the power plugs and switch on the server as described in the chapter Completion on page 41f 2 2 1 ...

Page 25: ... a socket place it on an insulated antistatic surface with the smooth side down Never slide a processor over a surface 6 1 Installing a second processor The system board can be upgraded with a second processor V CAUTION You may only use processors of the same type The second processor must have the same clock frequency as the first For dual processor mode use a suitable multiprocessor operating sy...

Page 26: ...gure 9 Removing the heat sink dummy Ê Remove the two screws and lift out the heat sink dummy Installing the processor Figure 10 Opening the socket lever Ê Release the socket lever by pressing it sideways and pull it upward as far as it will go 1 Ê Open the cover 2 Ê Remove the plastic cover 3 1 2 3 ...

Page 27: ...n carefully press it into the socket 1 V CAUTION The processor can only be installed in one particular direction Note the marking on one of the corners To avoid damaging the pins or the processor do not force it into the socket Ê Close the cover 2 Ê Lock the processor in place in the socket by returning the socket lifter to its original position 3 1 2 3 ...

Page 28: ...screws in diagonally opposite sequence 2 V CAUTION Never install a processor without a heat sink The processor is likely to overheat which may cause damage to the processor and the system board Installing the air duct Ê Reinstall the air duct Reattach the air duct Ensure that the hooks on the air duct see figure 8 on page 24 engage on the fan s rear panel Ê Close the server plug in the power plugs...

Page 29: ...er Preparation on page 17f Ê Lift the air duct up and off Figure 13 Removing the processor heat sink Ê Remove the four screws of the heat sink in diagonally opposite sequence see figure Ê Turn the heat sink carefully back and forth to loosen it Then lift it out to remove it Ê Remove the residual thermal paste from the underside of the heat sink Ê Clean the underside of the heat sink using a lint f...

Page 30: ...e socket 3 Figure 15 Installing the new processor Ê Position the new processor over the socket and then carefully press it into the socket 1 V CAUTION The processor can only be installed in one particular direction Note the marking on one of the corners To avoid damaging the pins or the processor do not force it into the socket Ê Close the cover 2 Ê Lock the processor in place in the socket by ret...

Page 31: ...nk on the processor such that the airflow arrow labeled is facing the rear side of the server see page 28 Ê Fasten the heat sink by tightening the four screws in a crossover pattern Ê Reinstall the air duct Ensure that the hooks on the air duct see figure 8 on page 24 engage on the fan s rear panel Ê Close the server plug in the power plugs and switch on the server as described in the chapter Comp...

Page 32: ...ft it out to remove it Ê Clean the surface of the processor with a lint free cloth Ê Fit the heat sink on the processor such that airflow arrow is facing to the rear side of the server see page 28 Ê Attach the heat sink with four screws Tighten the screws in diagonally opposite sequence see page 28 Ê Reinstall the air duct Ensure that the hooks on the air duct see figure 8 on page 24 engage on the...

Page 33: ... 11ff The PRIMERGY RX200 S3 Server is equipped with a slimline bay intended for a CD DVD drive The mounting slot already contains an empty frame which must be removed for installing the CD DVD drive Figure 16 Removing the CD DVD frame Ê Push the green spring button 1 Ê With the other hand push the frame out towards the front 2 2 1 ...

Page 34: ...re 17 Installing the CD ROM DVD drive Ê Angle the drive as shown above and install it in the two lateral hooks see circles on the frame Figure 18 Fastening the CD DVD drive Ê Fasten the CD DVD drive using the two screws see circles on the frame ...

Page 35: ...RX200 S3 OptionsGuide 35 CD DVD Drive Figure 19 Inserting the CD DVD drive Ê From the outside slide the CD DVD drive into the bay 1 until it engages in the connector 2 1 2 ...

Page 36: ......

Page 37: ... server correctly Ê If your operating system has not switched off the sever press the on off switch Ê Unplug the power plugs The system board has one PCI X and one PCIe x8 slot Because of the server s installation height these can only be used via a riser card Two different types of riser card are available here Type A Two slots for PCI X controller Slot 1 64 bit 100 MHz low profile max length 175...

Page 38: ...ug PCI Slots Type B One slot each for a PCI X and a PCIe controller Slot 1 64 bit 100 MHz low profile max length 175 mm Slot 2 PCIe x8 max length 315 mm Figure 21 Riser card type B 1 PCI X and 1 PCIe x8 I Both slots are not hot pluggable Slot 1 Slot 2 ...

Page 39: ...two green points labeled with LIFT UP and pull it up and out Installing a controller Ê Please read the documentation supplied with the controller Ê Plug any necessary cables onto the controller Ê Remove the slot cover from the riser card holder I Keep the slot cover for future use If you remove the controller you must reinstall the slot cover to comply with EMC regulations regula tions on electrom...

Page 40: ...Make sure that the slot cover fits into the appropriate recess Ê If necessary plug in the cables on the board and other components Reinstalling the riser card holder Ê Position the riser card holder on the system board s PCI slots Ê Using the green points labeled with PUSH push the riser card carefully into the PCI slots Ê Close the server plug in the power plugs and switch on the server as descri...

Page 41: ...ety information in the chapter Safety Instructions on page 11ff 9 1 Closing the server Figure 24 Installing the cover Ê Position the top cover so that it projects approx 1 cm to the rear Ê Push the top cover completely forward The housing button will engage automatically ...

Page 42: ...n the rack Ê Push the prepared server into the rails that are attached to the rack until the server rails engage I Ensure that the server is inserted horizontally and is not tilted Ê Press the safety springs in on both sides 2 Ê Gently push the server as far as it will go into the rack 3 Ê Fasten the server to the rack 4 using the two knurled screws front panel Ê Plug in all plugs and switch the s...

Page 43: ...ver Reconfiguration and Restart ATA Advanced Technology Attachments BIOS Basic Input Output System BMC Baseboard Management Controller CC Cache Coherency CD Compact Disk CD ROM Compact Disk Read Only Memory CHS Cylinder Head Sector CMOS Complementary Metal Oxide Semiconductor COM Communication CPU Central Processing Unit DC ...

Page 44: ... Desktop Management Interface ECC Error Checking and Correcting ECP Extended Capabilities Port EEPROM Electrically Erasable Programmable Read Only Memory EMC ElectroMagnetic Compatibility EMP Emergency Management Port EPP Enhanced Parallel Port ESD Electrostatic Sensitive Devices FPC Front Panel Controller FRU Field Replaceable Unit FSB ...

Page 45: ...ser Interface HDD Hard Disk Drive HSC Hot Swap Controller I C Inter Integrated Circuit I O Input Output ICM Intelligent Chassis Management ID Identification IDE Integrated Drive Electronics IRQ Interrupt Request Line LAN Local Area Network LBA Logical Block Address LCD Liquid Crystal Display LUN ...

Page 46: ...al Retention Latch NMI Non Maskable Interrupt NVRAM Non Volatile Random Access Memory OS Operating System PCI Peripheral Component Interconnect PDA Prefailure Detection and Analysis POST Power ON Self Test RAID Redundant Arrays of Independent Disks RAM Random Access Memory ROM Read Only Memory RSB Remote Service Board RTC ...

Page 47: ...e Enclosures SAS Serial Attached SCSI SATA Serial ATA SBE Single Bit Error SCA Single Connector Attachment SCSI Small Computer System Interface SDR Sensor Data Record SDRAM Synchronous Dynamic Random Access Memory SEL System Event Log SMI System Management Interrupt SSU System Setup Utility SVGA Super Video Graphics Adapter USB ...

Page 48: ...48 OptionsGuide RX200 S3 Abbreviations Universal Serial Bus VGA Video Graphics Adapter ZCR Zero Channel RAID ...

Page 49: ...able in the Internet can be found via the URL http manuals fujitsu siemens com choose industry standard servers 1 Safety notes and other important information 2 Ergonomics 3 Warranty 4 System Board D2300 Technical Manual 5 BIOS Setup Reference Manual 6 PRIMERGY RX200 S3 Operating Manual 7 Quick Start Hardware PRIMERGY RX200 S3 Leaflet 8 Quick Start Software PRIMERGY ServerView Suite Leaflet 9 PRIM...

Page 50: ...19 Rack Technical Manual 16 PRIMERGY ServerView Suite ServerView S2 Server management User Manual 17 PRIMERGY ServerView Suite ServerView Server management User Manual 18 PRIMERGY ServerView Suite RemoteView User Manual 19 LSI Logic MegaRAID SAS Software User s Guide 20 LSI Logic MegaRAID SAS Device Driver Installation 21 Integrated SAS for RAID User s Guide ...

Page 51: ...dummy 26 I information material 6 installation cover 41 riser card holder 40 ventilation duct 28 L light emitting diode LED 15 lithium battery exchange 14 M main memory 21 exchange 23 upgrade 7 23 meaning of the symbols 8 multiprocessor operating system 25 N notational conventions 8 notes on handling CDs 14 on the laser 15 P PCI board upgrade 39 processor exchange 29 installation 25 26 module 26 u...

Page 52: ...52 OptionsGuide RX200 S3 Index controller 39 main memory 23 PCI board 39 V ventilation duct installation 28 ...

Page 53: ... Server System RX200 S3 Comments Suggestions Corrections Submitted by Fujitsu Siemens Computers GmbH User Documentation 33094 Paderborn Germany Fax 0 700 372 00001 email manuals fujitsu siemens com http manuals fujitsu siemens com ...

Page 54: ......

Page 55: ... Server System RX200 S3 Comments Suggestions Corrections Submitted by Fujitsu Siemens Computers GmbH User Documentation 33094 Paderborn Germany Fax 0 700 372 00001 email manuals fujitsu siemens com http manuals fujitsu siemens com ...

Page 56: ......

Page 57: ...tsu com Copyright Fujitsu Technology Solutions 2009 Hinweise zum vorliegenden Dokument Zum 1 April 2009 ist Fujitsu Siemens Computers in den alleinigen Besitz von Fujitsu übergegangen Diese neue Tochtergesellschaft von Fujitsu trägt seit dem den Namen Fujitsu Technology Solutions Das vorliegende Dokument aus dem Dokumentenarchiv bezieht sich auf eine bereits vor längerer Zeit freigegebene oder nic...

Reviews: