background image

 

 

 

 

 

 

 

 

 

Installation Manual – POWER 365 –6.1 – 8.1 – 2020/03/18 –  

    

Page 

1

 of 

18

 

 

 

 
 

 

 

 

 

-

 

 Installation Manual - 

Simple bracket solar street light 6.1 / 8.1 

Summary of Contents for 6.1

Page 1: ...Installation Manual POWER 365 6 1 8 1 2020 03 18 Page 1 of 18 Installation Manual Simple bracket solar street light 6 1 8 1 ...

Page 2: ...PV voltage 30V nighttime PV voltage 0V Avoid any shadow on the solar panel trees houses traffic signs Shadows will considerably impact electricity production of the panel and hence reduce recharging of the battery Avoid artificial light on the solar panel during nighttime This could hinder correct detection of sun fall by the panel and can worst case completely disable switching on of the light ...

Page 3: ...stallation of batteries should happen before the date indicated on the packing Contact FONROCHE Lighting in case you need to store them longer Mechanical parts Mechanical parts must not be stored directly on the ground or near a storage place of powdery products The storage area should be sufficiently ventilated to avoid any deterioration Poles strapping should be removed for storage periods longe...

Page 4: ... digital device notice This equipment has been tested and found to comply with the limits for a Class B digital device pursuant to part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference in a residential installation This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the inst...

Page 5: ...Page 5 of 18 N screw Thread type Tightening torque Nm 11 M6 10 10 M8 24 3 8 setscrews M10 47 7 M10Setscrews 16 Part list ...

Page 6: ... careful setting the nuts on the top side of the luminary Use a draw wire fish tape to draw the connector cable of the lantern through the bracket to the top For all the setup every screw nut system must be tightened to the torque advocated by FONROCHE See table on page 4 1 2 ...

Page 7: ...of 18 Insert the cable into the tube 18 Assemble the bracket on the pole and orientation Orient the luminary fasten slightly each setscrew and then tighten them all Insert the tube into the bracket 20 X 8 4 3 ...

Page 8: ...Page 8 of 18 Assemble the base support Set to 20 unless otherwise stated 3 4 4 5 6 18 17 16 5 IMPORTANT Be so attentive to the lantern cable inside the tube when passing the screws N 3 ...

Page 9: ...Page 9 of 18 4 5 6 4 8 14 Assemble the support for PV modules Be careful to set the screws n 8 in the same way as illustrated in the scheme to avoid any problem when installing the battery 6 ...

Page 10: ...Page 10 of 18 Install the first PV binding on the ground Erect the street light 15 6 4 8 4 5 7 Install only one PV binding n 15 before erecting the pole Once the street light erected go to step 9 8 ...

Page 11: ...nder the support 13 Install the second binding the battery and connect the luminary 15 Assemble the PV 10 9 Box Energy Labels up Same steps as step 7 Pass the cable under the battery Energy Box label should be positioned always to upside direction to PV ...

Page 12: ...Page 12 of 18 Orient the PV to the south Orient the PV towards the equator Tighten the 8 setscrews Position the luminaries straight in order to optimize the lighting X 8 15 11 ...

Page 13: ...Page 13 of 18 Connect the PV to the battery Initialize the battery Please wait 30 seconds after plugging for system activation pour que le système s active 12 13 ...

Page 14: ...Page 14 of 18 1 Validate your installation Detach one connector of each PV with the Universal tool disconnect n 1 1 2 14 ...

Page 15: ... of 18 Light ON Then you can reconnect the PV Wait 1 min max light must switch ON Wait another min max light must switch off If light switches OFF installation is OK You can bind all the cables with cable ties ...

Page 16: ...uld be the same streetlight serial number 15 Streetlight Labeling 2 Meters Streetlight pole label to be pasted and protected with a larger transparent film protection IMPORTANT Degreasing and cleaning are mandatory on the place where the label will be affixed ...

Page 17: ... towards the same direction Is the PV set to 20 tilt unless otherwise stated Are all the cable ties installed so that the cables will not hang anywhere Are all the parts installed on the solar streetlight If parts remain please check on this manual to find out what has been forgotten and please be careful to install everything Have the nut screws systems been correctly tightened according to the t...

Page 18: ...lation test Bad cables connection Check that all connectors are connected and correctly locked onto the Power 365 battery system unit If the installation happens too late in the evening the system unit doesn t detect the solar module and the system stays in low power transport mode Wait until next day so that the output voltage of the solar module is high enough The light doesn t work after it has...

Reviews: