background image

BEFORE YOU BEGIN

ATTENTION: Read instructions 
carefully before use.

Recommended setup procedures are 
outlined in this document. 

For safety reasons it is recommended 
that at least two persons erect any  
marquee setup.

Ensure the area is free from any sharp 
objects, overhead structures or other 
obstructions.

  WARNING: Keep clear of   
  overhead power lines.

SIZES: 5x5m, 6x6m

CONTENTS

WHAT YOU’LL NEED 

 

1

PARTS LIST 

 

1

HOW TO STORE 

 

1

TRANSPORTING  

 

1

SECURING YOUR MARQUEE 

 

1

5X5M SETUP INSTRUCTIONS 

 

SECURING YOUR MARQUEE 

 

2

5X5M  PACK DOWN INSTRUCTIONS 

 

3

6X6M SETUP INSTRUCTIONS 

 

SECURING YOUR MARQUEE 

 

6X6M CORRECT ROOF PLACEMENT 

 

5

6X6M PACK DOWN INSTRUCTIONS 

 

OPTIONAL ACCESSORIES INSTRUCTIONS   

6-9

IMPORTANT INFORMATION 

 

10

INSTRUCTIONS & CARE

THINGS YOU SHOULD KNOW

Your marquee is supplied with steel pins and 
tie-down ropes. These 

MUST

 all be used. For 

setup on hard surfaces such as pavement, 
weight plates, water weights or sandbags 

MUST

 be used for security.  

These are add-on accessories that can be 
purchased separately.

All roof tie-down straps 

MUST

 be attached 

and tensioned. These security methods 
will maximise safety. However, due to the 
unpredictable nature of weather, damage 
prevention is not guaranteed.

All folding marquees are considered temporary 
structures and 

MUST

 be packed down and 

stowed away in any adverse weather conditions 
such as storm, rain or wind gusts. Your marquee 
should never be left up unattended.

Prolonged exposure to the sun can seriously 
degrade the material and/or cause it to 
become discoloured.

WARNING: KEEP ALL FLAME 
AND HEAT SOURCES AWAY 
FROM THE TENT FABRIC.

This marquee is built with flame 
retardant. The fabric may burn if left 
in continuous contact with any flame 
source. The application of any foreign 
substance to the marquee fabric may 
render the flame-resistant properties 
ineffective.

THIS PRODUCT MEETS AUSTRALIAN 
STANDARDS

Please check with your local 
regulations prior to purchasing this 
item. Some municipalities have 
restrictions and requirements.

VISIT WEBSITE

CLICK HERE

Summary of Contents for X7 Tectonic Series

Page 1: ...ights or sandbags MUST be used for security These are add on accessories that can be purchased separately All roof tie down straps MUST be attached and tensioned These security methods will maximise safety However due to the unpredictable nature of weather damage prevention is not guaranteed All folding marquees are considered temporary structures and MUST be packed down and stowed away in any adv...

Page 2: ...l is shown on boxes Mallet Hammer to secure steel pins HOW TO STORE 1x Marquee Roof 1x Marquee Frame 1x Protective Cover PARTS LIST Standard package items listed below Please note accessories are not listed here Fit Tie Down Straps Sandbags Steel Pins or Weight Plates and anchor marquee into position Please check download engineer certificates from website for applicable hold down weight methods w...

Page 3: ...s Bars where LIFT HERE label is shown 1 Remove all your items from packaging and clear a safe area 8 Extend the left corner legs to desired height by stepping on the marquee foot plate and releasing the middle leg by engaging the pull ring 7 Ensure protective flaps are over the truss connectors Attach them by looping the straps around the truss and engaging the clips then tighten 5 Standing undern...

Page 4: ...afety reasons it is recommended that 2 persons pack down any marquee Be sure to remove any items used to secure the marquee to ground before packing it up 1 Release lower leg pins and fully retract left middle leg followed by corner legs Repeat for right side legs 5 Walk marquee in by grasping LIFT HERE section At a quarter of the way undo the velcro straps to remove roof for transport 2 Unclip ro...

Page 5: ...rotective flaps are over the truss connectors Attach them by looping the straps around the truss and engaging the clips then tighten 5 Refer to LIFT HERE sticker Grasp the marquee truss bars 9 Extend the front legs halfway Repeat for back and middle legs Using one foot stand on the marquee foot plate release the pull ring on the middle leg connector and extend front legs to desired height 10 Exten...

Page 6: ...alfway Once all legs are 50 retracted begin completely retracting all legs 3 Unclip all roof straps from the truss bars 4 Release all roof pins 6 Fit the protective cover to frame and store roof in a protective bag 6X6M CORRECT ROOF PLACEMENT Recommended procedure below For safety reasons it is recommended that 3 persons set up a 6x6m marquee The centre 3 roof poles are higher than the remaining 4...

Page 7: ...side 3 Insert half wall dislay bar into connector and tighten the connector Repeat 4 Attach velcro tabs to marquee legs 2 Insert half wall display bar through half wall sleeve 5 Attach the half wall support to the display bar 6 Adjust the height of the support leg until securely in position Position marquees side by side attach leg connector and tighten Attach rain gutter strip to marquee wall Put...

Page 8: ...f the adjustable poles in to the holes found in the horizontal awning rod 7 Twist the awning poles to extend or shorten and then reverse twist the poles to tighten 8 Hook and Eyelet Awning 2 Put wall hooks through eyelets in roof flap 2 Attach awning velcro to the velcro on marquee roof 6 Insert the ends of the adjustable poles in to the holes found in the horizontal awning rod 3 Insert the three ...

Page 9: ...es 1 On a bench or on the ground lay marquee on side extend inner leg of marquee WHEELED MARQUEE MOVING INSTRUCTIONS 1 Ensure brakes are engaged 3 Hold marquee with 2 hands 4 Disengage the brakes 5 Open frame slightly Never wheel a fully collapsed marquee 6 Grasp one leg and pull marquee in the desired direction Never push 7 Engage the breaks and refer to the Set Up Instructions 2 Remove standard ...

Page 10: ...nd the hook Secure the bauble around the screw fastener 8 Position the banner pole on the base slide the white ring down to secure 2 Small Banners 2m Extend the banner pole to the designated line 2m line and twist and keep twisting the pole to secure 3 Medium Banners 3m Extend the banner pole to the designated line 3m line and twist and keep twisting the pole to secure 4 Large Banners 4m Extend th...

Page 11: ... Years Q8 Quasar Frame 10 Years Wave Flare Banner Hardware 1 Year Cafe Umbrellas Frame 3 Year Star Shade Pole 1 Year Arch Tent Frame 3 Years EMX Inflatable Frame 5 Years Pavilion Frame 5 Years Pinnacle Frame 10 Years Crest Tent Frame 10 Years Table Covers 1 Year Pop Banner 1 Year Custom Banners Fence Wraps 1 Year Roller Banner 1 Year FABRICS Plain 500D PVC Coated Polyester 1 Year Printed 600D PU C...

Page 12: ...els use a soft mop and any mild household cleaning fluid such as dish detergent mixed with warm water When cleaning the roof of your marquee we recommend that the tent is fully opened and secured into position Remove any leg extensions or accessories such as side walls as these can be cleaned separately We recommend that the roof of your marquee be cleaned regularly in proportion to the frequency ...

Reviews: