background image

ASSEMBLY INSTRUCTIONS

www.SlopBuster.com 

SlopBuster

 distributed by Erie Products, 202 East Fox Rd., Sandusky, OH 44870   |  419-433-8293  |  [email protected]

STANDARD MAILBOX

SlopBuster

 Protection  

System mounts  

directly to base of 4" x 4"  

mailbox wood post.

PLASTIC MAILBOX

Access opening needs to be  

cut out then SlopBuster

  

Protection System can be 

mounted directly to base of  

4" x 4" wood post. 

DECORATIVE MAILBOX

Remote 4" x 4" wood post needs  

to be installed, for mounting of 

SlopBuster

 Protection System. 

Special Remote Installation  

Accessory is available for purchase 

OR just bury 4" x 4" into ground. 

(See page 8 first)

What's in the Box

Lower Tube

#SB-S005

Upper Tube

#SB-S006

End Cap

#SB-S007

Bottom Plate

#SB-S002

Bottom Bracket

#SB-S004

Upper Bracket

#SB-S003

Top Plate 

#SB-S001

#SB-F005

#SB-F006

#SB-F003

#SB-F010

#SB-F009

#SB-F008

#SB-F007

#SB-F001

#SB-F002

#SB-F004

TM

Summary of Contents for SlopBuster

Page 1: ...System can be mounted directly to base of 4 x 4 wood post DECORATIVE MAILBOX Remote 4 x 4 wood post needs to be installed for mounting of SlopBuster Protection System Special Remote Installation Acce...

Page 2: ...rew heads must be on bracket side and the nuts on flag side to allow for tube clearance Step 1 Assemble Top Bracket Step 1 Fasteners used Truss Head Screws SB F001 Nylon Top Locking Nuts SB F002 Step...

Page 3: ...e square holes if you choose to through bolt the bracket to your mailbox post with carriage bolts not supplied instead of the lag bolts supplied This can be done for the most rugged installation if re...

Page 4: ...so consideration must be taken when positioning the lower bracket so that the lower bracket will fasten securely to the post 4 3 Remove the scrap plastic piece and position the lower bracket through t...

Page 5: ...8 inch bolt securely as well making sure that the lower tube is aligned in a straight vertical position with the mailbox post Figure 5 2 Step 5 Fasteners used Top Bolt SB F009 Bottom Bolt SB F007 Nylo...

Page 6: ...e upper tube bend is facing the mailbox as shown in a vertical plane Figure 6 1 6 3 Next place one 3 8 16 X 3 bolt SB F009 through the upper and lower tubes Use a 3 8 Nylon head locknut SB F010 and se...

Page 7: ...o the bolts and tighten securely The flag assembly should be located in front of the largest portion of the mailbox Figure 7 3 8 1 Last locate the plastic tube end cap SB S007 and place it into the to...

Page 8: ...st is firmly in place a second piece of 4 x 4 wood post is placed into top of Support Tube Accessory The post should be long enough so when lower mounting bracket is installed on the post the measurem...

Reviews: