Murano / DLG-36
Shower Enclosure User’s Guide
I. Mounting Preparation
1.
After opening the case, read this introduction carefully, check all the packed parts, examine the shower cabinet
for shipping damage. If the unit has been damaged or has a finishing defect, please contact your local
distributor within 2 business days. Please note that DreamLine Guarantee will not cover shipping damage or
such finishing defects once the unit has been installed. Your distributor’s responsibility for damage in transit
is limited after the shower package has been transferred to the transportation company, so you may have to
contact the transportation company directly to report damage. Contact your distributor or DreamLine if you
have any questions.
2.
You should make sure that the floor is leveled and solid and will be able to support the total weight of the unit
and its occupant. You should also consult your local building codes on any questions on installation
compliance with standards.
3.
Install all of the required plumbing and drainage before securing the shower. Use a competent and licensed
(if required by local code) plumber for all plumbing installation.
4.
Please insure that prior to the installation the floor is leveled and the walls are at right angles. While some
adjustment in leveling of the tray is possible, irregular floor level or improper angle of side walls will result
in serious problems for your installation.
5.
Necessary Tools: Conventional woodworking tools, Screwdriver, Silicone sealant, Electric drill, Regular drill
bits (1/8”, 7/64”), Phillips screwdriver, Level, Measuring tape, Pencil and Stepladder. Bear in mind that you
will need at least two people to assemble the unit.