Caution:

1

  Read instructions completely before proceeding.

2

  Test lift prior to installation. 

Please Note: Packaging must be removed from lift  

  before testing.

3

  Follow instructions carefully. Installation contrary to instructions invalidates warranty.

4

  Do not obstruct operation of Scissor Lift SLX with fingers or any object. Serious  

  injury or damage could result.

5

  Maximum lifting capacity is 350 Lbs.

6

  Scissor Lift SLX is designed to accommodate ceiling suspended equipment.  

 

Equipment should not be allowed to rest on optional ceiling closure during  

  operation (refer to section titled “Installing Projector”).

7

  Entire bottom of unit must be unobstructed to permit proper operation. Sufficient clear- 

  ance must be allowed below projector or optional ceiling closure: 10' for Model SLX10,  

  14' for Model SLX14, etc.

8

  Unit must be installed level (use a carpenter’s level).

9

  Unit operates on 110-120V AC 60 Hz. current.

10

 Verify the show position when testing lift. Make required changes by referring to  

  adjustment instructions on page 4 of this document.

11

  The maintenance/service factory limit setting must not be adjusted to a lower  

  position than the preset factory limit setting. In addition, Draper does not  

  recommend setting show position at the maintenance/service position—for  

  example, if you wish to have 8' Show position, order a lift with at least a 10'  

  maintenance position.

CAUTION: Before servicing unit, disconnect hardwired control and any 

remote control.

Note:

 

Unit has been thoroughly inspected and tested at factory and found to be 

operating properly prior to shipment.

Planning

1

  Based on screen location and projector specifications, determine proper  

  position for projector installation.

2

  Confirm that there is adequate space for installation and operation. Minimum  

  clearance above ceiling level varies according to Scissor Lift model, plus height  

  of projector, optional mounting bracket, optional ceiling closure, and optional  

  Environmental Air Space Housing.

3

  Arrange to provide service access to the unit.

4

  Maximum lifting capacity is 350 Lbs.

As Soon As Scissor Lift Arrives

1

  Open carton and inspect for damage.

2

  Locate the following parts:

  A. The unit itself

  B. Controls 

  C. Optional equipment: Environmental Air Space Housing, Universal  

    Projector Mount, closure panel or ceiling finish kit (all ship in separate  

  cartons).

3

  Test lift prior to installation. 

Please Note: Packaging must be removed from  

  lift before testing.

Installation/Operating Instructions

Scissor Lift SLX Video Projector Lift by Draper

Hanging Unit

Please note: If using Environmental Air Space Housing option, go to 

Environmental Air Space Housing instructions on page 7.

  The Scissor Lift may be installed in a variety of ways; recessed above the 

ceiling, or suspended below the ceiling. The lift should be supported by four ½" 

threaded mounting rods. If ceiling recessed, the entire unit (including the projector) 

should set approximately 1½" above the finished ceiling in its “stored” position. The 

threaded rods should pass through the corner mounting flanges and be secured 

by nuts above and below. The unit should then be guy wired or blocked to prevent 

swinging.

All installations should observe the following guidelines:

1

  If installing above a hard ceiling, optional Draper Access Panels are available to  

  allow access to the unit.

2

  Installer must ensure that all fasteners and supports are of adequate strength to  

  securely support Scissor Lift and projector.

3

  Fastening methods must be suitable for mounting surface, and securely  

  anchored so that vibration or abusive pulling on unit will not weaken installation.

4

  Unit should be level, with weight shared more or less equally by all four  

  threaded mounting rods.

5

  Bottom of unit must be unobstructed after installation. Sufficient clearance must  

  be allowed below projector or optional ceiling closure.

6

  Do not use unit to support adjacent ceiling, light fixtures, etc.

7

  Do not complete the ceiling below unit until electrical connections have been  

  completed and unit has been operated successfully.

8

  We recommend that safety cables be attached to the Scissor Lift SLX for  

Electrical Connections

Unit operates on 110-120V AC, 60 Hz. current.

Opening the electrical box exposes terminals for field connections. Unit is shipped 

with internal wiring complete.Wire to connect unit to power supply should be 

furnished by installer. Connections should be made in accordance with wiring 

diagram, and wiring should comply with national and local electrical codes. All 

operating switches should be “off” before power is connected.

Caution: Make sure electrical supply has been disconnected before 

attempting to connect Scissor Lift to electricity.

Scissor Lift should be operated and checked prior to installing projector and/or 

optional ceiling closure.

Low Voltage Control Switch shown below comes with 75' of cable and should be 

plugged in to Control Panel on top frame of lift for control of the "Up" and "Show" 

positions. Momentary Key Switch shown below comes with 75' of cable and should 

be plugged in to Control Panel on top frame of lift for control of the "Service" 

position.

®

If you encounter any difficulties installing or servicing your Scissor Lift SLX, call your 

dealer or Draper, Inc. in Spiceland, Indiana, 765-987-7999, or fax 765-987-7142.

  added security (a sound installation practice with overhead equipment).

9

 When the Scissor Lift SLX is to be installed in “other space used for  

  environmental air” the optional environmental air space housing must  

  be installed per instructions to isolate the lift from the “other space  

  used for environmental air.”

Operation

  Before operating or testing the unit, make sure the packaging has been 

removed from the unit. This can be accomplished by removing the eight screws 

(four per side) holding the packing frame to the lift. Once the packaging is all 

removed, operate the lift in the "Up" direction, so the lift's control encoder will 

recognize it's "home" location. Until you do this, the Down function will not work. 

  When unit is first operated, be cautious! If unit fails to operate properly, press 

“off” and recheck electrical connections before proceeding. Cycle unit down and 

up several times to confirm satisfactory operation. 

You must also do this if the 

Scissor Lift ever loses or is disconnected from the power.

Caution: Do not pull on or touch safety belt when unit is in motion. If belt 

locks, the cables will unspool.

Caution: Obstructing bottom pan may cause cables to unspool.

Standard Single Station Low Voltage Control (See Fig. 1)—

One three-button 

switch with “Up”, “Down”, and “Off” buttons. Lift starts up or down when appropriate 

button is pressed, and may be stopped by pressing “Off” button. Factory set 

limit switches stop lift automatically when projector is in “show” position. One 

momentary key switch lowers lift from “Show” to “Service” position.

Optional Multiple Station Control

—Optional, moves lift from “Stored” to “Show” 

position only. Each switching station has a three-button switch with “Up”, “Down”, 

and “Off” buttons. Lift starts up or down when appropriate button is pressed, 

and may be stopped by pressing “Off” button. Factory set limit switches stop lift 

automatically when projector is in “Show” position.

Optional Key Operated Switch—

If ordered, the standard LVC-S can be replaced 

with a second single station, momentary key-operated three position (up/off/down) 

switch. Multiple Station Control required for this option. Moves lift from “stored” to 

“show” position only.

Optional Infrared or Radio Frequency Remote Control—

If ordered, a three-

button transmitter is provided, with “up”, “down”, and “stop” buttons. Unit starts up 

or down when appropriate button is pressed, and may be stopped by pressing 

“off” button. Factory set limit switches stop unit automatically when projector is in 

“show” position. Only controls "show" and "stored" positions.

Optional RS232 Control—

For Serial communication an R2D7 Serial 

Communications Interface is optionally available.

Low Voltage Trigger—

Input provided for Low Voltage Trigger from projector (see 

diagram on page 4).

Please Note: Scissor Lift SLX must be installed in accordance with the 

requirements of the Local Building Codes, the Canadian Electrical Code 

(CEC), CAN/CSA C22.1 and the National Electric Code (NEC), NFPA 70, as 

required. An appropriate disconnect device shall be provided as part of the 

building installation.

D C U

2¾"

4½"

7

/

8

"

Front

Side

Back

UP

OFF

DOWN

UP

DOWN

OFF

LVC-S

SP-KSM

Up & Show

Service

Figure 1

Caution: Beware 

of pinch points

Summary of Contents for SLX14

Page 1: ... to the Scissor Lift SLX for Electrical Connections Unit operates on 110 120V AC 60 Hz current Opening the electrical box exposes terminals for field connections Unit is shipped with internal wiring complete Wire to connect unit to power supply should be furnished by installer Connections should be made in accordance with wiring diagram and wiring should comply with national and local electrical c...

Page 2: ... the mount pre installed you will need to install a new Projector Pan which includes the Universal Projector Mount s rectangular plate 1 Lower unit until the Bottom Pan is resting on a tabletop or other stable and sturdy surface 2 Remove Lifting Cable Bar from Bottom Pan see Fig 2 3 Remove bolts holding Projector Pan to Bottom Pan see Fig 2 4 Remove Projector Pan and set aside 5 Place new Projecto...

Page 3: ...tions included in this document Ceiling tile by others Lower section of Environmental Air Space Housing Trim Ring 1 2 3 8 9 7 4 7 5 6 Item Qty Part Number Description 1 1 C028 546 Frame SLX Closure Trim 2 1 C044 181 07SA Panel SLX Assembled Closure 3 2 C002 845 07SA Bracket SLX Closure 4 4 C077 035 49 Rod 3 8 16 x 177 8 L Threaded Zinc 5 8 C013 050 Washer 375 I D x 875 O D x 064 TK GRD 2 Zinc Flat...

Page 4: ... Position has been set See the operation above where Show Position is not yet set Remember that clearing and setting the Show Position does not affect the closed position limits Adjustments CAUTION Be sure all switches are in Off position before adjusting limit switch Always be prepared to shut lift off manually when new adjustment is being tested Please refer to wiring diagram Caution The mainten...

Page 5: ... Switch BK RD BL Motor BL WH WH WH 125V 10A Outlet BK BK WH GN N 110 120 Vac Supply Dashed wiring by electrician RD WH BK RD WH WH RD BK WH RD Encoder Low voltage wiring by others Low Voltage Trigger 6 24 VDC Wall Switch Key Switch RP RQ Bus Ports for remote controls such as Eye Port for IR Eye RF Receiver LED Wall Switch and RS232 ...

Page 6: ...ble A 357 16 371 16 42 36 3911 16 42 35 19 16 1 8 Top View Front View Side View Scissor Lift SLX Dimensions Table A Closed Extended Model Height Height SLX10 141 16 10 7 SLX14 165 16 14 2 SLX17 189 16 17 8 SLX21 2013 16 21 3 SLX24 231 16 24 9 SLX28 255 16 28 5 5 20 41 48 22 19 41 Front Back View Side View ...

Page 7: ...ber Description 1 1 C028 544 02SA Frame SLX Plenum 2 1 C028 545 07SA Frame SLX Trim Ring 3 4 C044 178SA Panel SLX Plenum Side 4 4 C044 180SA Panel SLX Plenum End 5 2 C044 179SA Panel SLX Middle End 6 2 C044 177SA Panel SLX Plenum Middle Side 7 1 C095 123SA Cover SLX Plenum 8 28 C020 325 Screw 8 32 x 3 8 Type 1 HWH 9 40 C018 051 Nut 8 32 Zinc Hex KEPS 10 12 C013 070 Washer 188 I D x 5 O D x 07 TK N...

Reviews: