background image

 

 

Dosatron unit sold separately.

 

   

ASSEMBLY INSTRUCTIONS

 

IPK34 - 14 GPM 

Industrial Plumbing Kit 

2090 Sunnydale Blvd.   

  Clearwater, FL 33765 

727-443-5404   

800-523-8499    

For units: D14MZ2, D14MZ5, D14MZ10, D14MZ3000

 

2015-02   LA     2011-140-GEN23_14 GPM 

For quick priming (helpful at low water flows): 

  Shut off outlet ball valve 

  Insert injection hose into the chemical container 

  Turn on the stainless steel ball valve (collect discharged  

     solution or send it to drain) 

  Observe the injection hose. When full, count 10 clicks 

  Shut off stainless steel ball valve 

  Turn outlet ball valve on  

 

For sample collection: 

  Make sure the unit is primed 

  Shut off outlet ball valve 

  Turn stainless steel ball valve on 

  In a clean container, collect 2.5 gallons of diluted solution 

  Shut off stainless steel ball valve 

  Collect sample out of the 2.5 gallons and check  

     concentration 

  Turn on the outlet valve

   

Reviews: