background image

02

7R

97

76

02

7R

97

76

© Danfoss | DCS (ms) | 2020.01

AN331637222900en-000101 | 1

Installation Guide

ICAD Actuators

 

Mechanical installation of ICAD on ICM 

Included in the ICAD box:

New EPDM O-ring 

New PTFE ring

Molycote 55 grease

1. 

Remove existing O-ring and PTFE ring* on the ICM adapter with your fingers. 

Do not use any tool because it may damage the O-ring/PTFE ring

2. 

Install the new PTFE ring*

3.

Apply Molycote 55 grease in groove below o-ring

4.

Apply Molycote 55 grease on the EPDM O-ring

5.

Install the new EPDM O-ring in groove

6.

Observe that Molycote 55 grease is distributed, in the groove, 

all around the ICM adapter 

7.

Apply a very thin film of Molycote 55 around and on the ICAD magnets

8.

Turn all 3 set screws about 3 turns clockwise 

and then counterclockwise back to its original 

position

O-ring

PTFE ring

Groove where ICAD 

set screws are fastend

This Installation guide cover installation of ICAD

• on complete new ICM top part (function module)

• on ICM top part already in operation

*If the ICM top part is new there is no need to replace PTFE ring

Clockwise

Counterclockwise

ICM bonnet

Reviews: