APPLICATION REQUIREMENTS:
This modification is available to all LA400 North American gate
operators.
FUNCTION:
Allows existing LA400 control board in the field to be replaced or
upgraded with a new LA400 control board.
I N S T A L L A T I O N I N S T R U C T I O N S
REMOVE EXISTING BOARD
1. Remove screws in each corner and open control box cover
(Figure 1).
2. Disconnect terminals leads to both batteries and the 24VAC or
solar input at the board.
3. Remove the coaxial cable going to the antenna at the board F
connector (Figure 2).
4. Remove all quick connect terminals in use to the logic board
(Figure 2).
• Wiring terminals
• Motor connectors
• Alarms
• Reset terminals
NOTE:
Remember location of all wire connections for
reinstallation
.
5. Disconnect the earth ground wire from the board
connector (J4).
6. Remove the screws (4) that fasten the control board to the
mounting bracket and remove the existing control board.
To prevent possible SERIOUS INJURY or DEATH from
electrocution or fire, disconnect power at the fuse box BEFORE
proceeding.
WARNING
CAUTION
WARNING
WARNING
Control Board
Replacement Kit
Screws
Batteries
Mounting
Bracket
Cover
Logic Board
Figure 1
1
K001A6039