background image

LVN5250A-R2 Hardware Installation Guide

BLACK BOX

®

Veri-NAC—the fastest-to-deploy, easiest-to-use 

network access control (NAC) appliance for  

intrusion prevention, vulnerability management, 

and regulatory compliance.

Veri-NAC

 Hardware Installation Guide

LVN5250A-R2

Order toll-free in the U.S.: Call 877-877-BBOX (outside U.S. call 724-746-5500)

FREE technical support 24 hours a day, 7 days a week: Call 724-746-5500 or fax 724-746-0746

Mailing address: Black Box Corporation, 1000 Park Drive, Lawrence, PA 15055-1018

Web site: www.blackbox.com   •   E-mail: [email protected]

Customer 

Support 

Information

Summary of Contents for Veri-NAC

Page 1: ...gulatory compliance Veri NAC Hardware Installation Guide LVN5250A R2 Order toll free in the U S Call 877 877 BBOX outside U S call 724 746 5500 FREE technical support 24 hours a day 7 days a week Call 724 746 5500 or fax 724 746 0746 Mailing address Black Box Corporation 1000 Park Drive Lawrence PA 15055 1018 Web site www blackbox com E mail info blackbox com Customer Support Information ...

Page 2: ...otection against such interference when the equipment is operated in a commercial environment Operation of this equipment in a residential area is likely to cause interference in which case the user at his own expense will be required to take whatever measures may be necessary to correct the interference Changes or modifications not expressly approved by the party responsible for compliance could ...

Page 3: ... gabinetes que impidan el flujo de aire por los orificios de ventilación 10 El equipo eléctrico deber ser situado fuera del alcance de fuentes de calor como radiadores registros de calor estufas u otros aparatos incluyendo amplificadores que producen calor 11 El aparato eléctrico deberá ser connectado a una fuente de poder sólo del tipo descrito en el instructivo de operación o como se indique en ...

Page 4: ...afety Notice and Warnings 5 2 Ratings 5 3 Electrical and General Safety Guidelines 5 4 Site Preparation 7 5 Unpacking the Appliance 7 6 Installing the Appliance 8 6 1 Installing the Appliance in a 4 Post Rack 8 6 2 Installing the Appliance in a 2 Post Rack 9 7 Rear Panel Connections 10 8 Front Panel Operation 10 ...

Page 5: ...ON Power down the appliance following the operating system s proper power down procedure from the front panel Unplug all AC power cord s before servicing CAUTION To avoid electrical shock check the power cords as follows This product is to be installed in a Restricted Access Location only Use the exact type of power cords required Use power cord s that come with safety certifications Power cord s ...

Page 6: ...assis and in the room so you can disconnect the power supply if an accident occurs Take extra precautionary measures when working with high voltage components Do not work alone Before removing or installing main system components be sure to disconnect the power first Turn off the system before you disconnect the power supply Use only one hand when working with powered on electrical equipment to av...

Page 7: ...ances in a rack make sure the overall loading for each branch circuit does not exceed the rated capacity Do not slide more than one appliance out from the rack at a time Extending more than one appliance at a time may result in the rack becoming unstable Install your appliance in the lower part of the rack because of its weight and also for ease in accessing appliance components Circuit Overloadin...

Page 8: ...o rack clips into the top and bottom of three holes on each side in the rack as shown The tabs on each should be on the top and bottom to help stabilize them in the holes No tools are needed to install the clips firmly press them into place Make sure the clips are level in height on the left and right sides for proper alignment to allow accurate appliance installation Figure 6 1 Step 1 illustrated...

Page 9: ...he rack NOTE When installing or removing the appliance from the rack make sure to support the unit at all times 6 2 Installing the Appliance in a 2 Post Rack Install the appliance in the 2 post rack as shown Insert one M5 x 12 screw and one M5 x 12 cone washer through the top and bottom holes in the ears on each side into the threaded holes in the rack Tighten each screw to secure the appliance in...

Page 10: ... panel connections Step 1 Connect the power cord Step 2 Connect the Ethernet cables Step 3 Connect any other required cables Proceed to Section 8 Front Panel Operation 8 Front Panel Operation Figure 6 Front panel Power on the appliance using the Power Button on the front panel NOTE The I O Power Button is the last button on the right when looking at the front of the appliance ...

Page 11: ...724 746 5500 blackbox com Page 11 LVN5250A R2 Hardware Installation Guide NOTES ...

Page 12: ... in 30 seconds or less Copyright 2012 Black Box Corporation All rights reserved Black Box and the Double Diamond logo are registered trademarks and Veri NAC is a trademark of BB Technologies Inc Any third party trademarks appearing in this manual are acknowledged to be the property of their respective owners Black Box Tech Support FREE Live 24 7 Tech support the way it should be Great tech support...

Reviews: