Page 1: ...XL FIREBOX SS Installation Instructions ...

Page 2: ...around the firebox The Firebox cavity must be a lined with a minimum of 3 8 thick cement board A 1300mm 51 18 B 177 8mm 7 C 165mm 6 5 1 Line the base with cement board and insert your Firebox into the base 2 Make sure the firebox is centered ...

Page 3: ...ontinue building the wall ensuring that there is a layer of cement board between the stud and your Firebox on all sides 4 First stud on either side of the Firebox must be flush with the Firebox and flange ...

Page 4: ...of the firebox to be able to continue with the wall 6 Screw the top of horizontal stud directly to the Firebox brackets use 0 5 inch metal zips 7 Continue building the wall 8 Support the firebox with screws around the flange into the stud ...

Page 5: ...9 Cover the firebox with sheetrock wonderboard stones tile etc 10 Mount the glass into firebox ...

Page 6: ...e bio ethanol The Bio Flame can only function optimally in the combination with this bio ethanol Never use another liquid or gel to refill The Bio Flame As a consequence the warranty will expire as well Installation of floor level The Bio Flame Fireplaces l Make sure Bio Flame is kept at least 20 inches away from furniture and other obstructions l Keep pets and small children away from The Bio Fla...

Page 7: ...re opening This is dangerous and can also cause the insert to de shape and damage the paint on the insert l Fill no more than 2 3 of the way to prevent overflow l When The Bio Flame is filled remove the funnel l The Bio Flame is ready to be used Important If you do not burn the Methylated Spirits until empty then you must not add more Methylated Spirits to the burner OR re ignite the burner until ...