1.

Remove  all  parts  from  the  box  and  become  familiar
with the parts as shown in Figure 1.

FIGURE 1

2.

Determine  which  side  of  the  bed  the  product  will  be
installed as shown in Figure 2.

FIGURE 2

3.

IMPORTANT:

Position  the  product  in  the  correct

orientation based on which side of the bed you will be
using this product as shown in Figure 3.

FIGURE 3

4.

Connect Base Tubes together as shown in Figure 4.

FIGURE 4

5.

NOTE:  This next step is dependent on which side of
the  bed  the  product  will  be  installed.

Attach  Base

Tubes  into  the  Base  Support  Tubes  as  shown  in
Figure 5.  Make sure the Spring Pins engage the hole
in the Base Support Tubes.

FIGURE 5

6.

Adjusting height of Main Handle:

As shown in Figure 6, the height of the handle can be
adjusted  up  or  down  by  loosening  the  Collets  by
rotating counter clockwise.  Depress both spring pins
so  the  handle  can  move  up  or  down  to  the  desired
height.  After adjusting the Main Handle to the desired
height, tighten Collets by rotating clockwise.

7.

Adjusting height of Main Handle legs:

As  shown  in  Figure 6,  the  Main  Handle  Adjustment
Legs can be adjusted up or down to engage the floor
by  depressing  the  spring  pins  so  the  legs  can  move
up or down to the desired height.

FIGURE 6