background image

Nouveau 7

Multifuel Stove

Operating & Installation Manual

PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE

Nouveau 7 Multifuel Stove

Rev 2

August 2004

AFS1120      

Summary of Contents for Nouveau 7

Page 1: ...Nouveau 7 Multifuel Stove Operating Installation Manual PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE Nouveau 7 Multifuel Stove Rev 2 August 2004 AFS1120...

Page 2: ...confident in the reliability of our product that we offer a Lifetime Guarantee Should you have any questions about our Nouveau Multifuel Stoves that are not covered in this manual please contact the...

Page 3: ...ire 11 Over Firing 13 Cleaning Annual Maintenance 13 14 Accessories 15 INSTALLATION Page General Precautions 16 Handling 16 Hearth 16 Combustible Materials 16 Firebox Liner Panels 17 Throat Plate Insp...

Page 4: ...E BURNED IN THIS APPLIANCE TO USE THESE FUELS WILL INVALIDATE THE APPLIANCE GUARANTEE IF IN DOUBT CONTACT THE SOLID FUEL ASSOCIATION TELEPHONE NUMBER 0800 600 000 www solidfuel co uk THE USE OF SPARE...

Page 5: ...rly installed and operated a house fire may result installation must comply with the Building Regulations and conform to all relevant fire safety standards Arada Ltd produce a variety of appliances ra...

Page 6: ...HECK LIST Part Description Visual Aid not to scale Nouveau 7 Multifuel 1 Grate Bars 5 2 Fuel Retainers 2 3 Throat Plate 1 4 Flue Spigot 1 5 5 Hot Plate 1 5 6 Ashpan 1 7 Operating Tool 1 8 Rear Liners...

Page 7: ...DATA Nouveau 7 Multifuel Room Heater with Domestic Hot Water with add in boiler type 1 2 Max Output to Room kW Max Output to Water kW 4 4 3 2 6 4 Height mm 620 Width mm 476 Depth mm 365 Height to Cent...

Page 8: ...ating the door knob if hot with operating tool anti clockwise to increase the the air inlet clockwise to reduce the air inlet or seal the ash door completely AARROW AIRWASH SYSTEM The air wash has an...

Page 9: ...e tool which is used for riddling and setting multifuel grate position and for emptying the ash pan Fig 4 Fig 4 RIDDLING Use the operating tool for setting the grate in the coal burning position or th...

Page 10: ...feet supplied Care should be taken whilst assembling the feet so as not to damage the painted surface of the fire The feet are positioned in each corner of the fire and fixed using the washers and scr...

Page 11: ...reheat Blazebrite Taybrite Sunbrite Doubles Singles Anthracite Large Nuts and Welsh Dry Steam Coal Large Small Nuts Approval does not cover the use of other fuels either alone or mixed with the suitab...

Page 12: ...he area is well ventilated during this time OVERNIGHT BURNING The appliance will bur overnight provided Sufficient fuel is placed in the firebox The controls are set correctly Excess draught is not pr...

Page 13: ...and could easily start a fire or cause an injury Replace the ash pan and close ash door Close the fire down CLINKER The formation of clinker suggests that the unit is being over fired Any clinker for...

Page 14: ...shut down period DOOR GLASS The door glass should remain clear during normal daytimeburning Howeverundercertainconditions such as burning at a low rate with damp wood or overnight burning the glass m...

Page 15: ...erchangeable canopy Fig 7 Remove the front clamps Tilt the canopy as shown in stage 1 Engage the rear clips and pull fully forward Fit the front clamps and tighten Fit the required blanking plates as...

Page 16: ...RTH The fire should be installed to stand on a constructional hearth of non combustible materials not less than 125mm 5 thick conforming to Building Regulations Dimensions of the hearth should project...

Page 17: ...to the front facing up The projecting lugs sit on top of the side liners The long centre tab on the back edge rests on the rear liners The shorter turn down tabs against the vertical face Replace the...

Page 18: ...ing end marked L onto the low section of the comb The upper bar is fitted in a similar manner but with the end marked L inserted in the rear channel and the end marked H seated on the high section of...

Page 19: ...umes from the stove outlet to the outside air To ensure a good updraught it is important that the flue gases are kept warm and that the flue size suits the stove The termination of the outlet at the t...

Page 20: ...Document J of the Building Regulations for England and Wales is available from The Stationery Bookshops and can also be viewed at the ODPM website at www safety odpm gov uk bregs brads htm Details on...

Page 21: ...Nouveau 7 Multifuel Stoves 21 INSTALLATION...

Page 22: ...ATED FLUES TYPICAL METAL INSULATED CHIMNEY SYSTEM TO BE INSTALLED TO THE CHIMNEY MANUFACTURERS INSTRUCTIONS IN COMPLIANCE WITH BUILDING REGULATIONS AND BS7566 PTS 1 4 A is minimum clearance for non in...

Page 23: ...n and calculations for individual heating systems should be carried out by a qualified heating engineer In many cases your supplier will be able to offer advice and assistance Direct Systems Stainless...

Page 24: ...om the expansion tank should be 28mm diameter copper Pipes in unheated spaces must be lagged FINAL CHECK Before handing over the installation to the customer it is strongly recommended that the applia...

Page 25: ...appliances only c If clay or concrete flue liners used confirm that they are correctly jointed with socket end uppermost and state jointing materials used d If an existing chimney has been refurbished...

Page 26: ...2 AFS1019 AFS001 AFS010 AFS008 AFS058 AFS009 2 Throat Plate 3 Grate Bar Set 4 Hot Plate 5 Operating Tool 6 Ashpan 7 Flue Spigot Part Description Visual Aid not to scale Nouveau 7 Part No Pictures show...

Page 27: ...35 AFS1077 9 Side Liner 10 Back Liner Set 11 Glass Replacement Kit Complete with Gasket 12 Glass Clips 13 Hinge kit Comprises 2 Hinges 4 Fixings Per Set 14 Airwash Part Description Visual Aid not to s...

Page 28: ...040 AFS997 16 Main Doors Assembly Complete with Handle Glass Gaskets Clips and Seal 17 Nouveau Feet Including Fixings 18 Cast Fire Door Locking Assembly 19 Aarrow Fires Gauntlet Gloves Part Descriptio...

Page 29: ...nnually by a qualified heating engineer The Manufacturers decision shall be final If your appliance proves to be defective as a result of faulty materials or workmanship during guarantee we will repai...

Page 30: ...s manual please contact your Aarrow retailer Please keep all repair receipts safely Please ensure you have this manual available when an engineer visits as they will complete the service record chart...

Page 31: ...labour incurred in its replacement Documentation must be retained and produced in the event of a warranty claim This guarantee specifically does not cover accidental damage misuse wear tear The use of...

Page 32: ...al No I ve checked it and it s O K Assembled by Checked by Date of Purchase Name and address of supplier Please ensure installer completes INSTALLATION CHECK LIST details on page 25 of this manual If...

Reviews: