LINEAR SHOWER DRAIN INSTALLATION INSTRUCTIONS

Zurn Industries, LLC

 

|

 

Specification Drainage Operation

1801 Pittsburgh Avenue, Erie, PA  U.S.A. 16502 · Ph. 855-663-9876, Fax 814-454-7929
In Canada

 

|

 

Zurn Industries Limited

3544 Nashua Drive, Mississauga, Ontario L4V 1L2 · Ph. 905-405-8272, Fax 905-405-1292

www.zurn.com

®

Rev.

-

Date:

4/23/2018

C.N. No.

139950

Form No. FT1009

Page 6 of 6

Dimensional data (inches and [mm]) are subject to manufacturing tolerances and change without notice.

Typical Drain Placement in Bathroom Floor Construction

Back of the Shower Location

Multi-Unit Shower Room

Entrance Way (Curb or Curbless)

ENTRANCE

ENTRANCE

ENTRANCE

ENTRANCE

Summary of Contents for ZS880

Page 1: ...near drain please pay close attention to the following guidelines and warnings Please handle all stainless steel material with caution The manufacturing process used in making this product can inadvertently produce sharp edges which may result in injury if handled or used improperly Please adhere to all torque specification requirements outlined within these instructions when tightening hardware d...

Page 2: ...nce the anchor legs are placed at the necessary height retighten each 6 32 PHMS to secure the legs in place STEP 4 Attach the 2 51 no hub drain outlet to the 2 51 drain pipe before lagging the anchor legs down A shielded coupling shall be used to make this connection Ensure that the coupling clamps are tightened before lagging the anchor legs down to a base STEP 5 For convenience the anchor legs a...

Page 3: ...are the same type and require a 1 8 3 Allen wrench provided to adjust them To Adjust the Tiling Frame STEP 8 Measure the required finish floor height from the top surface of the waterproofing membrane to the top edge of the tiling frame STEP 9 Loosen each 10 24 FHHSS that secures the tiling frame until the frame can move freely up and down STEP 10 With the tiling frame resting on the leveling scre...

Page 4: ...crews will be obscure when viewing the top surface of the grate Note The in lay tile grate rests inside of the tiling frame and does not get secured to the frame To Secure the Grate STEP 14 Locate the two crossbars on the underside of the grate and note their locations STEP 15 Set the grate into the frame so that it sits flush and centered Viewing through the slots of the grate from the top side t...

Page 5: ...2 Ph 905 405 8272 Fax 905 405 1292 www zurn com Rev Date 4 23 2018 C N No 139950 Form No FT1009 Page 5 of 6 Dimensional data inches and mm are subject to manufacturing tolerances and change without notice Typical Installation Drawing SUBFLOOR THINSET ADHESIVE ADJUSTABLE TILING EDGE FRAME WATERPROOFING MEMBRANE TILE THINSET ADJUSTABLE LEG TILE THINSET WATERPROOF MEMBRANE CONCRETE SUBFLOOR GROUT TIL...

Page 6: ...44 Nashua Drive Mississauga Ontario L4V 1L2 Ph 905 405 8272 Fax 905 405 1292 www zurn com Rev Date 4 23 2018 C N No 139950 Form No FT1009 Page 6 of 6 Dimensional data inches and mm are subject to manufacturing tolerances and change without notice Typical Drain Placement in Bathroom Floor Construction Back of the Shower Location Multi Unit Shower Room Entrance Way Curb or Curbless ENTRANCE ENTRANCE...

Reviews: