INSTALLATION INSTRUCTIONS FOR
ZN1201, ZF1201, Z1201-XH, AND Z1201-XB
WATER CLOSET SYSTEMS
Zurn Industries, LLC
|
Specification Drainage Operation
1801 Pittsburgh Avenue, Erie, PA U.S.A. 16502 · Ph. 855-663-9876, Fax 814-454-7929
Rev.
B
In Canada |
Zurn Industries Limited
Date:
04/13/2018
3544 Nashua Drive, Mississauga, Ontario L4V 1L2 · Ph. 905-405-8272, Fax 905-405-1292
C.N. No.
139851
www.zurn.com
Form #
C51
Page
5 of 5
16. Thread a backup nut and bearing washer onto each
5/8 [16] rod. Adjust hardware so that the front surface
of each flat washer is 1/16 [2] in front of the finished
wall (see
Figure 16
). All bearing washers must be on
the same plane to support the fixture and prevent
cracking.
17. Peel off the removable backing from one-side of the
Neo-Seal Gasket and seat into the groove of the water
closet outlet horn. See
Figure 17
.
18. Peel off removable backing liner from the opposite side
of the gasket and hang the water closet onto the
threaded rods. Ensure Neo-Seal gasket seals to the
coupling. See
Figure 18
.
19. Assemble a fiber washer and cap nut onto each rod
and hand tighten. Secure closet with an additional
half-turn using a wrench on each nut to complete the
installation. See
Figure 19
.
Note:
The closet should not make contact with the
finished wall.
Figure 16
Figure 17
Remove backing
from one side of
the Neo-Seal
Gasket
Remove backing
from exposed side
of the Neo-Seal
gasket.
Figure 18
Note:
Finished
Wall Not
Figure 19
Finished
Backup Nut & Bearing
Closet to be
located 1/16 [2]
from the finished
wall
Coupling to extend
5/16 [8] from the
finished wall
Neo-Seal
Coupling
Fiber
Washer &
Cap Nut
Finished
Wall
Faceplat
Carrier
Fitting
Rear Anchor
Assembly
Feet bolted to floor w/ min ø1/2 [13] bolt
(supplied by others)
Finished
Floor
Water Closet Bowl
(supplied by
others)