background image

Zurn  Industries,  LLC

 

|

 

Specification  Drainage  Operation

1801 Pittsburgh Avenue, Erie, PA  U.S.A. 16502 · Ph. 855-663-9876, Fax 814-454-7929
In  Canada

 

|

 

Zurn  Industries  Limited

3544 Nashua Drive, Mississauga, Ontario L4V 1L2 · Ph. 905-405-8272, Fax 905-405-1292

www.zurn.com

Rev.

A

Date:

5/15/2018

C.N. No.

140024

Form  No. FT902

Page 2 of 7

Dimensional data (inches and [mm]) are subject to manufacturing tolerances and change without notice.

Z880

ACCESSORIES

Above are some of the trench drain components typical to an installation.  Double check your order to ensure that you have all
components particular to your job before beginning your installation.

Contact Zurn ‘Flo-Thru’ at 855-663-9876 should additional  material be required.

Summary of Contents for Z880

Page 1: ...1292 www zurn com Rev A Date 5 15 2018 C N No 140024 Form No FT902 Page 1 of 7 Dimensional data inches and mm are subject to manufacturing tolerances and change without notice WARNING Cancer and Reproductive Harm www P65Warnings ca gov ADVERTENCIA Cáncer y daño reproductivo www P65Warnings ca gov AVERTISSEMENT Cancer et effets néfastes sur la reproduction www P65Warnings ca gov Z880 SHALLOW TRENCH...

Page 2: ...n com Rev A Date 5 15 2018 C N No 140024 Form No FT902 Page 2 of 7 Dimensional data inches and mm are subject to manufacturing tolerances and change without notice Z880 ACCESSORIES Above are some of the trench drain components typical to an installation Double check your order to ensure that you have all components particular to your job before beginning your installation Contact Zurn Flo Thru at ...

Page 3: ...018 C N No 140024 Form No FT902 Page 3 of 7 Dimensional data inches and mm are subject to manufacturing tolerances and change without notice Z880 EXCAVATION Trench excavation must be 4 102mm greater than the trench depth and a minimum of 4 102mm greater than the edge of the trench on each side Soft and or shifting soil substrates may cause cracking of the concrete and consequent movement of the tr...

Page 4: ... 2018 C N No 140024 Form No FT902 Page 4 of 7 Dimensional data inches and mm are subject to manufacturing tolerances and change without notice Z880 JOINT CONNECTION Assembling the trench run is easy using Flo Thru s mechanical interlocking joints Simply align the male end above the female end and slide together The bottom interlock should snap together A silicone caulk or a construction adhesive s...

Page 5: ...cturing tolerances and change without notice Z880 OUTLETS AND ACCESSORIES To attach an end outlet or end cap cut trench to desired length if necessary and attach with provided screws and a silicone caulk or a construction adhesive if desired A bottom outlet is attached to the bottom side of the trench drain with provided screws and a silicone caulk or a construction adhesive if desired as shown be...

Page 6: ...ssissauga Ontario L4V 1L2 Ph 905 405 8272 Fax 905 405 1292 www zurn com Rev A Date 5 15 2018 C N No 140024 Form No FT902 Page 6 of 7 Dimensional data inches and mm are subject to manufacturing tolerances and change without notice Z880 OVERALLLAYOUT Upon completion of the trench excavation the channels should be placed in order alongside the excavation and according to the job layout ...

Page 7: ... to manufacturing tolerances and change without notice Z880 SETTING THE TRENCH After attachment of acessories anchor and level trench in the excavation using concrete patties around the feet Make finish pour of concrete and be certain to properly vibrate concrete to eliminate any unwanted voids Finish troweling should be done to set the top edge of the trench drain 1 16 1 6mm below the floor grade...

Reviews: