ZURN PEX
®
PLUMBING AND RADIANT HEATING SYSTEMS
1801 PITTSBURGH AVENUE, ERIE, PA, U.S.A. 16502 PHONE: 800/872-7277 FAX: 800/209-2148 www.zurn.com
IN CANADA:
ZURN INDUSTRIES LIMITED
3544 NASHUA DRIVE, MISSISSAUGA, ONTARIO L4V 1L2 PHONE: 905/405-8272 FAX: 905/405-1292
Page 2
1" QickZone
®
Modular Brass Manifold
Installation Instructions
QHMAVKIT5 and QHMBVKIT5 Assembly
Step 1:
Lubricate O-rings and rubber with silicone grease.
Step 2:
Thread
Self-Sealing Endpiece
into the female end of the
Manifold Supply and Return End Modules.
Step 3:
Thread
Air Vent
into the top of the
Self-Sealing Endpiece
.
Step 4:
Thread
Drain Valve
into the bottom of the
Self-Sealing
Endpiece
.
Step 1:
Thread
Red Handled Ball Valve
into
Manifold Supply
End Modules.
Step 2: Thread Blue Handled Ball Valve
into
Manifold Return
End Modules.