FV740 Rev. C 04/06/21
Page 4
1.a. Install endpoint on wall surface within 2 feet radius of faucet
with dry wall anchors & screws or doubled sided VHB tape
1.b. For concealed wiring installation, drill 3/16” hole in wall
surface for DC power cable , route wire-end through hole to
HW6 unit. After routing, apply sealant around wire in hole.
Y-cable
Endpoint
3. Connect endpoint to Y-cable..
Endpoint & Electronic Module Installation Instructions
4. Connect Y-cable to electronics module assembly
Ceramic
Valve
2. Tighten electronics module assembly to shank and connect
water line(s).
5.a. ACA version: Connect supplied inline connector and AC
adapter.
5.b. Optional HW6 (Hardwired 6V) version: Connect supplied inline
connector and hardwire adapter. When securing the CWB wires
to the screw terminals on HW6 unit, the BLACK WITH DASHED
MARKINGS should be connected to the Positive (+) terminal, and
the SOLID BLACK wire should be connected to the Negative (-)
terminal.
ACA
-CWB
-HW6