background image

FV241  Rev. A 10/30/18 Page 8 

ZURN INDUSTRIES, LLC 

COMMERCIAL BRASS OPERATION, 5900 ELWIN BUCHANAN DRIVE, SANFORD, NC, U.S.A. 27330

PHONE: 1-800-997-3876 FAX: 919/775-3541 www.zurn.com

ZURN INDUSTRIES LIMITED 

3544 NASHUA DRIVE, MISSISSAUGA, ONTARIO L4V 1L2 PHONE: 905/405-8272 FAX: 905/405-1292

Summary of Contents for AquaVantage ZH Series

Page 1: ...e limited to the replacement of the defective goods Before installation and use the purchaser shall determine the suitability of the product for his intended use and the purchaser assume all risk and liability whatever in connection therewith Where permitted by law the implied warranty of merchantability is expressly excluded If the products sold hereunder are consumer products the implied warrant...

Page 2: ...ve with top spud connection ZH6003AV 3 4 Urinal valve with top spud connection ZH6010AV 1 1 2 Water closet valve with back spud connection ZH6017AV 1 1 2 Water closet valve with top spud connection Concealed ZH6140AV 1 1 2 Water closet valve with back spud connection ZH6142AV 1 1 2 Water closet valve with top spud connection ZH6150AV 1 1 2 Water closet valve for flushing rim floor drains ZH6152AV ...

Page 3: ... plumbing and double gang box per specification sheet and Figure A When installing your quality Zurn valve it is recommended that to protect the polished finishyou do not use a toothed wrench This will cause gouges and scratches on your valve STEP NO 1 Measure distance from finished wall to centerline of fixture spud cut supply pipe 1 1 4 shorter than this measurement Chamfer O D and I D See Figur...

Page 4: ...lear outlet tube of the push button Figure 4 through the large bottom hole of the cover plate Figure 3 Loosely mount the cover plate to the electrical box Figure 3 Run the top black nylon tubing through the small cover tube and small cover tube ring Figure 3 Run the top clear bottom nylon tubing through the large cover tube and large cover tube ring Figure 3 Place the main valve body in position a...

Page 5: ...6 Adjust Control Stop Adjust the control stop to meet the flow rate required for proper cleaning of the fixture Open control stop counterclockwise 1 2 turnfrom closed position Activate flushometer with pushbutton Adjust the control stop after each flush until the rate of flow delivered properly cleanses the fixture The final setting for urinals should be such that the fixture will not overflow whe...

Page 6: ...4 5 gal flush P6000 ECA FF Low Consumption Urinal Kit 1 0 gal flush P6000 EUA WS1 Water Saving Urinal Kit 1 5 gal flush P6000 EUA WS Full Flush Urinal Kit 3 0 gal flush P6000 EUA FF Repair Parts Inside Parts Product No Urinal Relief Valve Item 12 P6000 EU13 Closet Relief Valve Item 12 P6000 EC13 AquaVantage Rebuild Kits Product No Closet and Urinal Rebuild Kits Include Items 4 9 12 13 15 17 26 P60...

Page 7: ...ick or is short flushing 1 Damaged or punctured diaphragm 2 Enlarged orifice 1 Replace diaphragm to remedy problem 2 Replace diaphragm to remedy problem Flush valve will not shut off 1 Trip mechanism is not seating properly 2 By pass orifice is plugged or partially plugged 1 Disassemble parts and clean thoroughly 2 Examine by pass orifice and clean if necessary being careful not to enlarge orifice...

Page 8: ...RIES LLC COMMERCIAL BRASS OPERATION 5900 ELWIN BUCHANAN DRIVE SANFORD NC U S A 27330 PHONE 1 800 997 3876 FAX 919 775 3541 www zurn com ZURN INDUSTRIES LIMITED 3544 NASHUA DRIVE MISSISSAUGA ONTARIO L4V 1L2 PHONE 905 405 8272 FAX 905 405 1292 ...

Reviews: