
ZXR10 3900A/3200A Series Hardware Installation Manual
Power-on Procedure
Check the equipment room environment and hardware installation
before powering on ZXR10 RPS180.
1. Check whether the equipment room temperature, humidity
and voltage meet the installation requirements, as shown in
T
ABLE
14 TEMPERATURE AND HUMIDITY
Temperature (
℃
)
RH (%)
Item
Long-Term
Working
Condition
(Note 1)
Short-Term
Working
Condition
(Note 2)
Long-Term
Working
Condition
Long-Term
Working
Condition
Short-Term
Working
Condition
Scope
15
℃
~30
℃
-5
℃
~45
℃
30%~70%
20%~90%
1.
Under the normal working environment of ZXR10 RPS180, the
measurement values of temperature and humidity refer to those
measured at 2 m above the floor and 0.4 m in front of the device (the
measurement is done with no protective board in the front or at the
back of the cabinet).
2.
The short-term working condition means a continuous running period
of not more than 48 hours, and accumulated running periods a year
of no more than 15 days.
2. Check whether the power cables and the cables are connected
correctly and reliably or not.
3. Check other hardware.
4. Power on ZXR10 RPS180 in the following steps:
i. Turn on the external power supply.
ii. Turn on the power switch on the back plane of switch.
5. Power off procedure is shown as follows:
i. Turn off the power switch on the back plane of switch.
ii. Turn off the external power supply.
34
Confidential and Proprietary Information of ZTE CORPORATION