ZXR10 3900A/3200A Series Hardware Installation Manual
F
IGURE
39 DC
CABLE
C-PWR-084
The correspondence between two ends of DC cables are
shown in
T
ABLE
7 DC
CABLES
T
WO
E
NDS
C
ORRESPONDENCE
End A
End B
Power Signal
1
B1
-48VGND
2
B2
-48V
The end A is connected to -48V input socket. Connect two
terminals on end B according to labels pasted on each con-
ductor. The B1 is connected to -48VGND of DC power sup-
ply, and B2 is connected to -48V. The conductor labels on
end B are described in
.
T
ABLE
8 L
ABEL
End B1
End B2
-48VGND
-48V
ii. DC standby power C-PWR-072 is shown in
F
IGURE
40 DC S
TANDBY
P
OWER
C-PWR-072
The correspondence between two ends of DC cables are
shown in
30