LEGAL INFORMATION
Copyright © 2016 ZTE CORPORATION.
The contents of this document are protected by copyright laws and international treaties. Any reproduction or
distribution of this document or any portion of this document, in any form by any means, without the prior written
consent of ZTE CORPORATION is prohibited.
Additionally, the contents of this document are protected by
contractual confidentiality obligations.
All company, brand and product names are trade or service marks, or registered trade or service marks, of ZTE
CORPORATION or of their respective owners.
This document is provided “as is”, and all express, implied, or statutory warranties, representations or conditions
are disclaimed, including without limitation any implied warranty of merchantability, fitness for a particular purpose,
title or non-infringement. ZTE CORPORATION and its licensors shall not be liable for damages resulting from the
use of or reliance on the information contained herein.
ZTE CORPORATION or its licensors may have current or pending intellectual property rights or applications
covering the subject matter of this document. Except as expressly provided in any written license between ZTE
CORPORATION and its licensee, the user of this document shall not acquire any license to the subject matter
herein.
ZTE CORPORATION reserves the right to upgrade or make technical change to this product without further notice.
Users may visit the ZTE technical support website http://support.zte.com.cn to inquire for related information.
The ultimate right to interpret this product resides in ZTE CORPORATION.
Revision History
Revision No.
Revision Date
Revision Reason
R1.1
2016-01-27
l
Added the installation of the 2+0 XPIC configuration in “3.2.3
2+0 Buckle Installation”.
l
Added the Installation of antenna in “Appendix B Installing
Antenna”.
l
Added the installation and cable connection of the PIMDC in
“Appendix D, Installing the PIMDC”.
l
Added the Installation of PSE in “Appendix E Installing PSE”.
l
Added the completed installation in the power cable scenario,
PoE scenario, and AC power supply scenario in “Section 1.1
Completed Installation”.
l
Added the steps of making the power cable plug in “Section
3.3 Installing the Power Cable”.
l
Added the wire sequence description of the 568B standard
straight network cable in “Section 3.4.1 Installing the Ethernet
Cable”.
l
Added the cross-connection description of the 2+2 XPIC
HSB protection configuration and the 2+2 XPIC SD
protection configuration in “Section 3.6 Installing the XPIC
Cross-Connection Cables (Optional)”.
SJ-20151105160201-004|2016-01-27 (R1.1)
ZTE Proprietary and Confidential
Summary of Contents for ZXMW NR8950
Page 4: ......