Chapter 1
Routine Maintenance
Routine maintenance includes daily maintenance, monthly maintenance, and quarterly
maintenance.
Table of Contents
1.1 Daily Maintenance
1.1.1 Checking the Status of Boards
This procedure describes how to check the status of boards.
By checking the status of boards, maintenance personnel can detect and resolve board
faults in a timely manner.
Steps
1.
Log in to the WEB LMT system, In the left navigation tree, select
Home > Home
. The
board status information is displayed in the right pane, see
Figure 1-1 Board Status Information
2.
(Optional) If the running indicator of a board is lit red, troubleshoot the board fault
immediately.
For detailed information, refer to the "
ZXMW NR8120AD Digital Microwave
Transmission System Alarm and Notification Handling Reference
".
– End of Steps –
1-1
SJ-20150804150350-006|2015-09-17 (R1.0)
ZTE Proprietary and Confidential