C h a p t e r
3
Equipment Installation
Table of Contents
Components to be Installed ...............................................25
Installation Flow ................................................................25
Installation Precautions ......................................................26
Installation Preparation ......................................................27
Installing Cabinets .............................................................30
Installing External Cables ...................................................47
Cabinet Installation Check ..................................................60
Power-on..........................................................................61
Components to be Installed
Installation components include:
1. ZXMBW E9230 cabinet
Note:
The cables inside the ZXMBW E9230 cabinet and function mod-
ules have been installed before shipment.
2. External cable
3. Main antenna feeder system (including antenna, feeder and
main feeder)
Installation Flow
illustrates the installation flow of ZXMBW E9230.
Confidential and Proprietary Information of ZTE CORPORATION
25