ZXG10 iBSC Hardware Installation Guide
The ZXG10 iBSC and the distribution frame use different grounding straps, but
they can be regarded as the same grounding point. In this case, nearby grounding
should be adopted. Both the iBSC equipment and the distribution frame should
be connected to the nearest grounding strap in the equipment room to reduce the
influence of the grounding wire, as shown in
.
Figure 6-8 Grounding Grid 1
1.
Equipment room
2.
Distribution frame
3.
iBSC equipment
4.
Grounding grid
b.
In this case, the grounding is shown in
Figure 6-9 Grounding Grid 2
1.
Equipment room
2.
Distribution frame
3.
iBSC equipment
6-12
SJ-20110531095035-004|2011-10-28 (R2.0)
ZTE Proprietary and Confidential
Summary of Contents for ZXG10 iBSC