ZXG10 iBSC Hardware Installation Guide
Figure 5-20 Pressure Plate Assembly
1.
Pressure plate
2.
Washer
3.
Insulating washer
4.
Insulating shim
5.3.2 Installation Flow
Feet installation mode is shown in
.
Figure 5-21 Cabinet Installation Flow on Cement Floor
5.3.3 Positioning Cabinet
Context
Determine the installation position of the cabinets according to the equipment room
construction plan. The critical factor for cabinet positioning is the determination of the
positions of 4 ground expansion bolts.