Chapter 7 Installing GPS Antenna Feeder System
Figure 7-42 Bottom View of Rack-Top (I)
2.
The feeder connects the N connector.
After the feeder from the antenna is routed from upper cabling rack and connects the
N connector for lightning protector, you shall tighten the bolt and screw, to make sure
that the lightning protector is reliably grounded. Refer to
Figure 7-43 Side View of Rack-Top
Tip:
For the indoor forwarding scheme, the indoor receiving antenna can directly connect
the lightning protector / power divider through TNC/N coaxial connector and is mounted
at the cabinet top.
3.
Install the SMA jumper.
shows the SMA jumper.
7-35
SJ-20110531095035-004|2011-10-28 (R2.0)
ZTE Proprietary and Confidential
Summary of Contents for ZXG10 iBSC
Page 8: ...II ...
Page 167: ...Figures Figure 11 7 Step 3 of Board Unplugging 11 5 V ...