ZXG10 iBSC Hardware Installation Guide
Figure 7-20 Dimension of inner & outer conductor for processed 1/2" feeder
4.
Remove the sweepings on the 1/2″ feeder by using a brush, apply the lubricant on the
surface of outer conductor, and put the O-type seal ring into the fourth trough slot, as
shown in
Figure 7-21 Install O-Type Seal
5.
Separate the front part of the feeder connector from the rear part, and insert the feeder
into rear connector till it contacts the first feeder corrugation. Turn it left and right, so
the outer conductor of feeder expands and contacts the rear connector. Finally, the
rear connector is aligned into the first trough slot for outer feeder conductor, as shown
in
.
7-16
SJ-20110531095035-004|2011-10-28 (R2.0)
ZTE Proprietary and Confidential
Summary of Contents for ZXG10 iBSC
Page 8: ...II ...
Page 167: ...Figures Figure 11 7 Step 3 of Board Unplugging 11 5 V ...