ZXC10 BTSB I28A Installation Manual
7-14
7.2.4 Installing the RF Cables for a Two-carrier Three-sector BTS
1. Connecting the RF cables
Fig. 7.2-8 shows the circuitry on the front panel of the rack for the two-carrier
three-sector BTS.
RFOUT
RFIN
HPA
RFOUT
RFIN
HPA
RFOUT
RFIN
HPA
RFOUT
RFIN
HPA
A
C
B
A
TX
RX2
TRX
RX1
TX
RX2
TRX
RX1
TX
RX2
TRX
RX1
TX
RX2
TRX
RX1
f1
f2
RFE-DUP
ANT
TEST
HPA
RFE-DUP
ANT
TEST
HPA
RFE-DUP
ANT
TEST
HPA
RFE-DUP
ANT
TEST
HPA
A
f1
A
C
B
f2
f1:A-ANT
f1:B-ANT
f2:A-ANT
f2:B-ANT
RFOUT
RFIN
HPA
RFOUT
RFIN
HPA
C
B
TX
RX2
TRX
RX1
TX
RX2
TRX
RX1
RFE-DUP
ANT
TEST
HPA
RFE-DUP
ANT
TEST
HPA
C
B
f1:C-ANT
f2:C-ANT
RX2
RX4
RX3
RX1
RX2
RX4
RX3
RX1
RX2
RX4
RX3
RX1
RX2
RX4
RX3
RX1
RX2
RX4
RX3
RX1
RX2
RX4
RX3
RX1
Fig. 7.2-8 Circuitry on the Front Panel of the Rack for the Two-carrier Three-sector BTS
2. Cabling of the front panel