background image

13

Three Year Warranty

Project Fire Products warrants its 
enclosed Zonecheck flow-switch tester 
to be free from defects in materials 
and workmanship under normal use 
and service for a period of three years 
from date of manufacture. Project 
Fire Products makes no other express 
warranty for this flow-switch tester. 
No agent, representative, dealer or 
employee of the Company has the 
authority to increase or alter the 
obligations or limitations of this 
warranty. The Company’s obligation 
of this Warranty shall be limited to the 
repair or replacement of any part of the 
flow switch tester, which is found to be 
defective in materials or workmanship 
under normal use and service during 
the three-year period commencing 
with the date of manufacture. After 

phoning Project Fire’s number, 01889 
271271 for a Return Authorization 
number, send defective units postage 
prepaid to Project Fire, Pasturefields 
Industrial Estate, Pasturefields Lane, 
Hixon, Staffs, ST18 0PH. Please include 
a note describing the malfunction and 
suspected cause of failure. The Company 
shall not be obligated to repair or replace 
units, which are found to be defective 
because of damage, unreasonable use, 
modifications, or alterations occurring 
after the date of manufacture. In no 
case shall the Company be liable for any 
consequential or incidental damages 
for breach of this or any other Warranty, 
expressed or implied whatsoever, even 
if the loss or damage is caused by the 
Company’s negligence or fault.

Summary of Contents for 450

Page 1: ...ZC450 IB 09 13 01 US InstructionBooklet Zonecheck450...

Page 2: ......

Page 3: ...made to ensure that the information contained within this document is correct Project Fire makes no guarantee for completeness or accuracy Project Fire Products Ltd reserves the right to change produ...

Page 4: ......

Page 5: ...s 01 Pre checks 02 Installation 03 Commissioning 04 Testing 05 Orientation 06 Typical connection 07 Key switch 08 Wiring 09 Dimensions 10 Specification 11 Troubleshooting 12 Important information 13 W...

Page 6: ...correct size manifold 3 Check that you have the correct model for your site right or left handed 4 Check that there is a key switch and key in the box 5 Inspect the product to make sure it hasn t been...

Page 7: ...heck that the sprinkler flow arrows on Zonecheck are facing the correct direction see diagrams included in this booklet 6 Fit the key switch to the wall in a suitable location that is easy to reach fr...

Page 8: ...7 Discharge water through the hose this is a once only commissioning test 8 Ensure the water flow LED is illuminated on the key switch make sure the key switch s power supply is on this could take up...

Page 9: ...ks 1 To test all the Zonechecks in the group insert the key into the key switch and turn to group test see fig 1 2 Look at the central fire control panel to confirm simultaneous activation of all the...

Page 10: ...r The pump direction of flow arrow faces the opposite direction to the system flow The red green stripes on the pump cartridge are always horizontal Do not position the flow switch on the underside of...

Page 11: ...06 Typical connection Atypicalmulti occupancyZonecheckInstallation Foranexampleofatypicalriserinstallationvisitourwebsite www projectfire co uk View from above Zone Valve...

Page 12: ...e key switch within 5m commissioning cable length of the Zonecheck Single Occupier Only A single occupier when the Zonecheck units are wired in parallel via interconnect can test all of the units by t...

Page 13: ...e occupier One fire alarm panel for all Zonechecks installed Multi occupier individual fire alarm panel for each tenant occupier Pump AC AC GND Interconnect WF input B Com B Com Pump L N L N Fire alar...

Page 14: ...09 Dimensions...

Page 15: ...v 60Hz 1 63A 185 W maximum IP44 12 bar 175 psi 5 0 F 400 VDB Key switch Mounting Type Operating Voltage Internat Consumption Operation Modes LED Operation Standby Ready state Test Initiation Flow Swit...

Page 16: ...aintained 7 Open the red valve and the green valve on Zonecheck Only pump light on Pump runs hot and does not operate the flow switch No lights on key switch Open the key switch and check the wiring a...

Page 17: ...Please ensure the commissioning engineer is aware of the closed Zonecheck valve status Always use a flat faced wrench for Zonecheck commissioning The suggested location for the key switch is at low l...

Page 18: ...workmanship under normal use and service during the three year period commencing with the date of manufacture After phoning Project Fire s number 01889 271271 for a Return Authorization number send d...

Page 19: ......

Page 20: ...ph 763 391 0990 fx 763 391 7668 cel 612 991 9791 8730 Jefferson Highway Osseo Minnesota 55369 USA www gviflow com GLOBAL VISION INC...

Reviews: